{"id":123202,"date":"2026-11-25T17:12:13","date_gmt":"2026-11-25T17:12:13","guid":{"rendered":"https:\/\/www.europesays.com\/spain\/123202\/"},"modified":"2026-11-25T17:12:13","modified_gmt":"2026-11-25T17:12:13","slug":"iberdrola-begins-e12m-santo-estevo-hydropower-overhaul","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/spain\/123202\/","title":{"rendered":"Iberdrola begins \u20ac12m Santo Estevo hydropower overhaul"},"content":{"rendered":"<p>\t\t\t\t\t\t<img decoding=\"async\" src=\"https:\/\/www.europesays.com\/spain\/wp-content\/uploads\/2026\/11\/261113-central-santo-estevo-428x241.webp\" alt=\"\"\/><\/p>\n<p>                        Image courtesy of Iberdrola<\/p>\n<p class=\"wp-block-paragraph\">Iberdrola Espa\u00f1a has begun modernising the Santo Estevo hydropower station in Ourense, north-west Spain, with the removal of Unit 2\u2019s approximately 250-tonne rotor. The lift required two specialised cranes and took three hours.<\/p>\n<p class=\"wp-block-paragraph\">The Unit 2 overhaul is expected to take one year and accounts for \u20ac3m of the \u20ac12m programme. Iberdrola carried out technical studies to assess the condition of the equipment and plan the work, which is intended to extend the units\u2019 service life, maintain operational reliability and performance, and update plant systems.<\/p>\n<p class=\"wp-block-paragraph\">Galician suppliers are supporting the programme with specialist maintenance, repair, assembly and machining. Companies named by Iberdrola include MILSA Trillo Galicia, Metal\u00fargica Gallega, Acebr\u00f3n, Teiga TMI, T\u00e9cnica 4, Montega, Tecdesoft, AIMEN, CEASA and CEFER.<\/p>\n<p class=\"wp-block-paragraph\">Santo Estevo is part of Iberdrola\u2019s hydropower portfolio in the <a href=\"https:\/\/www.iberdrolaespana.com\/about-us\/business-lines\/hydoelectric-energy\/sil-basin\" type=\"link\" id=\"https:\/\/www.iberdrolaespana.com\/about-us\/business-lines\/hydoelectric-energy\/sil-basin\" rel=\"nofollow noopener\" target=\"_blank\">River Sil catchment<\/a>. The company\u2019s plants in the catchment have a combined installed capacity of 1,582MW and generate an average of 3,000 GWh a year, equivalent to about half of Galicia\u2019s average annual hydropower output, according to Iberdrola.<\/p>\n<p class=\"wp-block-paragraph\">The original Santo Estevo station was inaugurated in 1956. Work on an expansion involving a new underground cavern began in 2008, and the addition of <a href=\"https:\/\/www.waterpowermagazine.com\/news\/voith-hydro-gets-equipment-order-for-san-esteban-ii\/\" type=\"link\" id=\"https:\/\/www.waterpowermagazine.com\/news\/voith-hydro-gets-equipment-order-for-san-esteban-ii\/\" rel=\"nofollow noopener\" target=\"_blank\">San Esteban II<\/a> in May 2013 brought the complex\u2019s total installed capacity to 451MW. The downstream San Pedro II underground power station entered service in January 2017 and acts as a counter-reservoir to regulate flows on the River Sil.<\/p>\n<p>                    <img decoding=\"async\" src=\"https:\/\/www.waterpowermagazine.com\/wp-content\/themes\/goodlife-wp-B2B\/assets\/images\/newsletter-new.svg\" alt=\"Email newsletter icon\"\/><\/p>\n<p>                    Sign up for our weekly news round-up!<\/p>\n<p class=\"gdm-newsletter-banner__sub-heading\">Give your business an edge with our leading industry insights.<\/p>\n","protected":false},"excerpt":{"rendered":"Image courtesy of Iberdrola Iberdrola Espa\u00f1a has begun modernising the Santo Estevo hydropower station in Ourense, north-west Spain,&hellip;\n","protected":false},"author":2,"featured_media":123203,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[122],"tags":[146],"class_list":["post-123202","post","type-post","status-publish","format-standard","has-post-thumbnail","category-iberdrola","tag-iberdrola"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/posts\/123202","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/comments?post=123202"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/posts\/123202\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/media\/123203"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/media?parent=123202"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/categories?post=123202"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/tags?post=123202"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}