{"id":77575,"date":"2026-08-29T13:34:48","date_gmt":"2026-08-29T13:34:48","guid":{"rendered":"https:\/\/www.europesays.com\/spain\/77575\/"},"modified":"2026-08-29T13:34:48","modified_gmt":"2026-08-29T13:34:48","slug":"spain-nuclear-power-extension-stabilizes-a-fragile-grid","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/spain\/77575\/","title":{"rendered":"Spain Nuclear Power Extension Stabilizes a Fragile Grid"},"content":{"rendered":"<p>In a significant policy twist, on 14 August Spain\u2019s government decreed<a href=\"https:\/\/www.boe.es\/diario_boe\/txt.php?id=BOE-A-2026-17756\" rel=\"noopener noreferrer nofollow\" target=\"_blank\"> a 3-year extension<\/a> for a pair of <a href=\"https:\/\/spectrum.ieee.org\/tag\/nuclear-power\" rel=\"nofollow noopener\" target=\"_blank\">nuclear power<\/a> plants with combined capacity of about 2 GW. In 2019, the plants at Almaraz, 200 kilometers southwest of Madrid, had been scheduled to shut down in 2027. A phase-out of nuclear power was a major plank of Spain\u2019s coalition government, so the delay has set off a <a href=\"https:\/\/www.europapress.es\/sociedad\/medio-ambiente-00647\/noticia-monica-garcia-rechaza-prorroga-almaraz-enmarca-dentro-discrepancias-sanas-dentro-gobierno-20260817105054.html\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">conflict with one of the coalition parties<\/a>. <\/p>\n<p>The decree blames the extension on \u201cthe crisis in the Middle East,\u201d but the decision comes as multiple factors have slowed or reversed several European countries\u2019 policies aimed at phasing out nuclear power. \u201cThe <a href=\"https:\/\/spectrum.ieee.org\/tag\/ukraine\" rel=\"nofollow noopener\" target=\"_blank\">Ukraine<\/a> war, the Iberian blackout, and rising natural gas prices have changed things a lot,\u201d says energy economist <a href=\"https:\/\/www.ucm.es\/deaeh\/drodriguez\" target=\"_blank\" rel=\"nofollow noopener\">Diego Rodr\u00edguez Rodr\u00edguez<\/a> of the Complutense University in Madrid, and who is also a former board member of the Spanish National Markets and Competition Commission. <\/p>\n<p>\u201cThe government could see that the system was going to need a lot of battery storage to catch up to its booming solar photovoltaic capacity, and they have used the Strait of Hormuz thing as cover.\u201d<\/p>\n<p>Europe\u2019s Nuclear Power Policy Shift<\/p>\n<p>Even before Russia\u2019s 2022 invasion of Ukraine, some <a href=\"https:\/\/spectrum.ieee.org\/tag\/european-union\" rel=\"nofollow noopener\" target=\"_blank\">European Union<\/a> countries were <a href=\"https:\/\/spectrum.ieee.org\/frances-nuclear-push-shows-that-germanys-phaseout-isnt-the-whole-story\" target=\"_self\" rel=\"nofollow noopener\">reconsidering plans to shut down nuclear power plants or even considering how to add nuclear generating capacity<\/a>. The invasion raised household electricity prices as EU nations scrambled for alternatives to Russian natural gas. In 2023, Sweden added nuclear to its energy-mix target alongside renewables. In 2025, <a href=\"https:\/\/www.neimagazine.com\/news\/belgium-abandons-nuclear-phase-out-plans\/\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">Belgium voted to repeal its 2003 nuclear-phaseout<\/a>. In 2026, France cancelled plans to shut down more than a dozen reactors, called for new reactors, and <a href=\"https:\/\/www.neimagazine.com\/news\/france-adopts-nuclear-heavy-energy-plan\/?cf-view\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">raised its targets for nuclear\u2019s role in the national energy mix<\/a>. Poland is planning to build its first nuclear <a href=\"https:\/\/spectrum.ieee.org\/tag\/power-plants\" rel=\"nofollow noopener\" target=\"_blank\">power plants<\/a> in 2028.<\/p>\n<p>Spain\u2019s nuclear capacity has hovered at around <a href=\"https:\/\/www.iea.org\/data-and-statistics\/charts\/share-of-net-electricity-generation-by-source-in-spain-2018-2025\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">20 percent of the national electricity mix<\/a> since a 2019 phase-out agreement. Nuclear power has contributed a relatively price-stable alternative to natural gas, and has also provided reliable base load to a grid that incorporates a growing share of time-variable <a href=\"https:\/\/spectrum.ieee.org\/tag\/renewable-energy\" rel=\"nofollow noopener\" target=\"_blank\">renewable energy<\/a> sources.<\/p>\n<p>Spain\u2019s long-stated goal has been to use renewables such as wind and solar to replace its most carbon-intensive energy sources; to get there, the government has provided a <a href=\"https:\/\/www.boe.es\/buscar\/doc.php?id=BOE-A-1998-30041\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">mixture of incentives<\/a>. Since 2022, <a href=\"https:\/\/spectrum.ieee.org\/tag\/spain\" rel=\"nofollow noopener\" target=\"_blank\">Spain<\/a> has added <a href=\"https:\/\/www.sistemaelectrico-ree.es\/en\/renewable-energies-report\/sun\/installed-capacity\/photovoltaic-solar-sunpower\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">more than 20 GW of photovoltaic capacity<\/a>. As of 2024, wind was contributing about <a href=\"https:\/\/www.pv-magazine.com\/2025\/03\/26\/solar-becomes-spains-top-power-source-in-2024\/\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">23 percent and solar 17 percent<\/a> of the country\u2019s electricity mix. <\/p>\n<p>All of that added renewable energy has created significant technological challenges. Grid operators must balance reactive power (essentially stored power that is shifted back and forth through the grid) with active power (the power drawn by users) to maintain a steady electricity supply. Outdated grid management rules exempted solar power plants from the same reactive power control contributions required of legacy plants, potentially exposing the grid to instability.<\/p>\n<p>On 28 April 2025, a series of <a href=\"https:\/\/www.entsoe.eu\/publications\/blackout\/28-april-2025-iberian-blackout\/\" target=\"_blank\" rel=\"nofollow noopener\">power oscillations, voltage gaps, and reactive power control failures<\/a> set off <a href=\"https:\/\/spectrum.ieee.org\/spain-grid-failure\" target=\"_blank\" rel=\"nofollow noopener\">a cascade of disconnections<\/a> across the Iberian Peninsula. The resulting blackout affected more than 60 million people for about 12 hours. While Spain\u2019s political parties debated how much of the blame belonged to the grid operator or renewables or other factors, the coalition government, with its tiny majority, could not afford another similar hit to the grid. Nuclear power offered a way to increase stability while the country shored up the resilience of its electric grid.<\/p>\n<p class=\"shortcode-media shortcode-media-rebelmouse-image\"> <img loading=\"lazy\" decoding=\"async\" alt=\"Exterior view of a nuclear power plant, with a large mountain range in the distance.\" class=\"rm-shortcode rm-lazyloadable-image\" data-rm-shortcode-id=\"d745a047bf9fc5f223e06be16e12e539\" data-rm-shortcode-name=\"rebelmouse-image\" data-runner-src=\"https:\/\/spectrum.ieee.org\/media-library\/exterior-view-of-a-nuclear-power-plant-with-a-large-mountain-range-in-the-distance.jpg?id=67687224&amp;width=980\" height=\"1250\" id=\"663b7\" lazy-loadable=\"true\" src=\"data:image\/svg+xml,%3Csvg%20xmlns='http:\/\/www.w3.org\/2000\/svg'%20viewBox='0%200%202000%201250'%3E%3C\/svg%3E\" width=\"2000\"\/> The Almaraz power plant is in Navalmoral de la Mata, in western Spain. Carlos Criado\/Europa Press\/Getty Images<\/p>\n<p>Spain Buys Time for a Grid Makeover<\/p>\n<p>For now, Spain\u2019s grid lacks sufficient <a href=\"https:\/\/theconversation.com\/en-espana-no-falta-electricidad-pero-empieza-a-escasear-la-infraestructura-para-conectarla-277589\" target=\"_blank\" rel=\"nofollow noopener\">storage and transmission capacity<\/a> to absorb new PV as quickly as it is being added. Instead, many <a href=\"https:\/\/www.pv-magazine.com\/2026\/02\/17\/spains-behind-the-meter-storage-grows-119-in-2025\/\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">installers are going behind the meter<\/a>, building almost one fifth of the country\u2019s solar PV at industrial sites that can use it themselves, such as at <a href=\"https:\/\/spectrum.ieee.org\/tag\/data-centers\" rel=\"nofollow noopener\" target=\"_blank\">data centers<\/a>.<\/p>\n<p>But upgrades are coming. In July 2025 Spain\u2019s Ministry for Ecological Transition and Demographic Challenge (MITECO) <a href=\"https:\/\/www.miteco.gob.es\/es\/prensa\/ultimas-noticias\/2025\/julio\/el-gobierno-aumenta-la-resiliencia-de-la-red-de-transporte-de-en.html\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">announced<\/a> EUR 750 million (US $ 874 million) investment in 65 new resilience measures, including synchronous condensers, flexible AC transmission systems, substation improvements, and switching relays. The country is also adding <a href=\"https:\/\/energy.ec.europa.eu\/topics\/infrastructure\/high-level-groups\/interconnections-south-west-europe_en\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">three more interconnections<\/a> to France to meet European recommendations.<\/p>\n<p>Investment in energy storage is also booming: At the time of the blackout, Spain had only 28 MW in battery storage capacity, but that number <a href=\"https:\/\/www.pv-magazine.com\/2026\/04\/29\/installed-bess-capacity-in-spain-grew-by-589-since-2025-blackout\/\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">almost sextupled to 193 MW<\/a> by April 2026. Spain is funding <a href=\"https:\/\/www.pv-magazine.com\/2026\/01\/05\/spain-allocates-funding-for-9-4-gwh-of-large-scale-storage-projects\/\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">2.2 GW in near-term large-scale energy storage projects<\/a> and has a <a href=\"https:\/\/www.miteco.gob.es\/es\/prensa\/ultimas-noticias\/2024\/septiembre\/el-gobierno-aprueba-la-actualizacion-del-plan-nacional-integrado.html\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">national target of 22.5 GW<\/a> (including pumped hydrogen and other non-battery systems) by the time of the rescheduled shutdown of its Almaraz nuclear plants in 2030.<\/p>\n<p>Slowing down the nuclear shutdowns buys Spain\u2019s embattled electric grid affordable base power with stable voltage, and avoids using more price-volatile, expensive natural gas. The Almaraz extension raises the question of which other nuclear plant shutdowns the government might delay, given that several were scheduled to end operations around 2030 as well. \u201cThe national consortium for dismantling the plants wouldn\u2019t even be able to dismantle them all at once anyway,\u201d Rodr\u00edguez says.<\/p>\n<p><a href=\"https:\/\/fundacionrenovables.org\/notas\/la-fundacion-renovables-considera-un-error-historico-la-decision-del-gobierno-de-prolongar-la-vida-de-la-central-nuclear-de-almaraz\/\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">Critics<\/a> of Spain\u2019s energy-policy pivot have argued that extending nuclear power will unfairly cut into the profits of investors in solar, who will have to curtail their power generation more at peak times. <a href=\"https:\/\/nataliafabra.org\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">Natalia Fabra<\/a>, an energy economist at <a href=\"https:\/\/cemfi.es\/about\/whoweare\/index.asp\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">CEMFI<\/a> in Madrid, Spain, <a href=\"https:\/\/link.springer.com\/article\/10.1007\/s13209-026-00333-4\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">wrote<\/a> this spring in the Journal of the Spanish Economic Association that \u201ckeeping nuclear plants online longer may lower prices and emissions at first, but it can also dampen clean investment incentives and lead to higher prices and emissions later on.\u201d<\/p>\n<p>There is no serious talk of building more nuclear power in Spain, Rodr\u00edguez says. He regards the delay more as a realistic move to better amortize the seven existing Spanish nuclear plants while the country invests more in storage and grid resilience. The 14 August decree itself <a href=\"https:\/\/www-boe-es.translate.goog\/diario_boe\/txt.php?id=BOE-A-2026-17756&amp;_x_tr_sl=de&amp;_x_tr_tl=en&amp;_x_tr_hl=en&amp;_x_tr_pto=wapp\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">insists<\/a> that \u201cthe requested extension does not compromise the contribution of Spain to the renewables objective.\u201d <\/p>\n<p>From Your Site Articles<\/p>\n<p>Related Articles Around the Web<\/p>\n","protected":false},"excerpt":{"rendered":"In a significant policy twist, on 14 August Spain\u2019s government decreed a 3-year extension for a pair of&hellip;\n","protected":false},"author":2,"featured_media":77576,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[4349,5949,8257,17],"class_list":["post-77575","post","type-post","status-publish","format-standard","has-post-thumbnail","category-spain","tag-energy-policy","tag-nuclear-power","tag-power-grid","tag-spain"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/posts\/77575","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/comments?post=77575"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/posts\/77575\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/media\/77576"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/media?parent=77575"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/categories?post=77575"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/tags?post=77575"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}