The results of the U.S. midterm elections are reshaping Texas’s political landscape and casting a policy shadow over the state’s rapidly expanding artificial intelligence infrastructure industry. Democratic candidate Gina Hinojosa defeated incumbent Republican Governor Greg Abbott, who was seeking a fourth term, becoming the first Latina female governor in Texas history. Meanwhile, Democrat James Talarico defeated Trump-endorsed Republican candidate Ken Paxton in the federal Senate race, becoming the first Democrat to win a Texas federal Senate seat since 1988. The result ends more than three decades of Republican control of the Texas governorship.
Following the announcement, AI-related assets came under broad pressure in Tuesday evening trading. Nasdaq-100 futures, which are tech-heavy, fell as much as 2%, more than double the decline in Dow futures. Cloud service provider CoreWeave (CRWV), which finances data center construction, fell about 7% on retail trading platforms, while peer Nebius Group (NBIS) dropped 4% and Oracle (ORCL) fell 4%. Texas-headquartered SpaceX (SPCX) declined 6%. Chip leader Nvidia also traded lower after hours.
Hinojosa made data center regulation a core campaign issue. She advocates an immediate moratorium on accepting new data center permit applications until the state legislature enacts comprehensive safeguards, and calls for repealing the existing 20-year tax exemption for hyperscale data centers. She criticized the policy for costing Texas at least $1 billion in tax revenue annually, and dismissed Abbott’s previously announced limited pause as lacking urgency and credibility. Newly elected Senator Talarico likewise advocates stronger data center regulation, proposing to end some tax subsidies and raise labor, environmental, and grid usage standards.
Texas’s centrality to this policy battle stems from its weight in the AI computing landscape. According to estimates from Wells Fargo, 27% of all planned U.S. data center power capacity is located in Texas, and the state is expected to account for roughly a quarter of new U.S. data center capacity through 2030. A report from commercial real estate firm JLL shows Texas is on track to surpass Northern Virginia and become the world’s largest data center market before 2030. Tech giants including Microsoft, Amazon, and Nvidia all have operations in the state.
MetricDataTexas share of planned U.S. data center power capacity27%Texas expected share of new data center capacity through 2030About one quarterScale of announced projects potentially affected by permit pause13.3 gigawattsAnnual tax revenue loss from current data center exemptionAt least $1 billion
Note: Data sources are Wells Fargo, JLL, and public reports.
Rapid expansion has stirred backlash in the Texas heartland. In West Texas and elsewhere, noise pollution from data centers, groundwater consumption, rising electricity bills, and encroachment on farmland have raised residents’ concerns, with protest groups forming, some of them organized by Republicans. A University of Houston survey of 2,000 likely voters conducted October 10-14 showed that more than 80% of Texas voters are worried about data centers’ impact on water supply and electricity prices, with a margin of error of 2.19 percentage points. Abbott announced in September a pause on approvals and grid connections for some data center projects, saying “Texans must come first.”
Similar political pressure is spreading across multiple states. Democratic candidates in Ohio, Wisconsin, and Pennsylvania have all made restricting data centers part of their campaign platforms. According to The Information, of the 36 states holding gubernatorial elections this year, 21 have at least one major-party candidate supporting a partial pause on data center construction—a trend that does not break cleanly along party lines.
This election carries particular significance for Musk. In recent years he has moved Tesla’s and SpaceX’s headquarters to Texas; SpaceX has a Starship launch base in South Texas, and he also plans to build Terafab, a large semiconductor manufacturing base jointly involving Tesla and SpaceX, in Grimes County. Musk spent nearly $450 million this midterm cycle to support Republican candidates, with the Texas Senate race one of the key battlegrounds, and he repeatedly criticized Talarico on social platform X. With Talarico’s victory, that political spending failed to translate into the expected results.
Market institutions are divided on the severity of the impact. Wells Fargo Chief Equity Strategist Ohsung Kwon warned before the election that a Democratic win in the Texas governor’s race could become a “left-tail risk event” for the AI trade. BofA strategist Michael Hartnett had also warned that Democratic control of the Senate plus a Texas governorship win could send stocks down more than 10% by year-end. Horizon Investments Chief Investment Officer Scott Ladner noted that Texas has long been fertile ground for building data centers, and a change of governor could make that ground “largely barren.”
Others argue the concerns are overblown. Altimeter Capital CEO Brad Gerstner said on election night that a Democratic victory could slow data center construction, but that fears of a policy shock may be exaggerated. John Sonsalla, president of Washington analysis firm Washington Analysis, noted that the truly worrying scenario was Talarico winning the Senate seat and Hinojosa defeating Abbott—which is exactly the magnitude of the negative impact on the AI trade. The firm’s analyst Rob Rains argued that Democratic control of Congress could strengthen policies to protect domestic industry and curb Chinese competitors, which may not be entirely bad for AI companies.
From a timing perspective, the election result does not mean existing data centers will halt immediately; the specific impact depends on the policy formulation and scope of implementation once the new government takes office. Texas still has advantages in industrial clusters, energy resources, and existing infrastructure. But the new administration may reassess the economic benefits and social costs of data centers, with grid connections, environmental reviews, and tax incentive terms all facing tightening. Evercore ISI strategist Julian Emanuel wrote in a pre-election report that the health of the AI revolution would be affected by the Texas governor’s race.
For investors, the near-term risk lies in policy uncertainty compounded by valuation and financing concerns surrounding the AI trade itself. The Nasdaq-100 Index had already pulled back at least 10% from its high by late October, entering technical correction territory; the Philadelphia Semiconductor Index fell about 19% over the past month. Changes in the pace of Texas approvals will directly affect data center capital expenditure expectations, which in turn transmit to chip, cloud services, and power equipment supply chain segments. Going forward, attention should be paid to whether Hinojosa delivers on her pledge of a broader permit pause, and whether new power and tax policies will alter tech companies’ investment plans in Texas.