{"id":137705,"date":"2026-11-12T19:39:20","date_gmt":"2026-11-12T19:39:20","guid":{"rendered":"https:\/\/www.europesays.com\/thestates\/137705\/"},"modified":"2026-11-12T19:39:20","modified_gmt":"2026-11-12T19:39:20","slug":"rocky-mountain-power-breaks-ground-on-wyoming-wind-energy-project","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/thestates\/137705\/","title":{"rendered":"Rocky Mountain Power Breaks Ground on Wyoming Wind Energy Project"},"content":{"rendered":"<p><a href=\"https:\/\/www.environmentenergyleader.com\/articles\/18199-rocky-mountain-power-faces-uphill-battle-on-proposed-net-metering-fee-hike\" rel=\"nofollow noopener\" target=\"_blank\">Rocky Mountain Power<\/a>, local leaders and community members kicked off construction efforts on a project that includes three new Wyoming <a href=\"https:\/\/www.environmentenergyleader.com\/articles\/21604-enels-320-mw-rattlesnake-creek-wind-farm-starts-operations\" rel=\"nofollow noopener\" target=\"_blank\">wind farms<\/a> that will provide a total 1,150 MW of new wind, which represents a nearly 60% expansion of PacifiCorp\u2019s current owned and contracted wind fleet. The project also includes a 140- mile high-voltage transmission line in Wyoming that will help more wind energy connect to PacifiCorp\u2019s transmission system.<\/p>\n<p>In addition to the new wind projects and transmission line, the company\u2019s Energy Vision 2020 initiative will upgrade, or \u201crepower,\u201d the company\u2019s existing wind fleet with longer blades and newer technology to boost output and extend the life of the projects.<\/p>\n<p>Projects within Energy Vision 2020 include:<\/p>\n<p>Repowering current <a href=\"https:\/\/www.environmentenergyleader.com\/articles\/21778-global-onshore-wind-turbine-commissioning-declined-in-2018\" rel=\"nofollow noopener\" target=\"_blank\">wind turbines<\/a>, Converse County<\/p>\n<p>Repowering current wind turbines, Carbon County<\/p>\n<p>New wind construction, Ekola and TB Flats I &amp; II, Carbon County<\/p>\n<p>New wind construction, Cedar Springs, Converse County<\/p>\n<p>Gateway West Transmission (Sweetwater &amp; Carbon Counties)<\/p>\n<p>According to Rocky Mountain Power, these investments will help diversify the state\u2019s economy, create jobs and add to the tax base. These projects are expected to:<\/p>\n<p>Create between 1,100 and 1,600 construction jobs in Wyoming and more than 100 full- time positions<\/p>\n<p>Add approximately $120 million in tax revenue from construction<\/p>\n<p>Bring significant post-construction annual tax revenues starting at approximately $11 million in 2021 and growing to $14 million annually by 2024<\/p>\n<p>\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"Rocky Mountain Power, local leaders and community members kicked off construction efforts on a project that includes three&hellip;\n","protected":false},"author":2,"featured_media":137706,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[51],"tags":[3187,14711,68356,56446,68355,14434,3427,17840],"class_list":["post-137705","post","type-post","status-publish","format-standard","has-post-thumbnail","category-wyoming","tag-community","tag-content","tag-content-management-system","tag-ecommerce","tag-epublishing","tag-publishing","tag-revenue","tag-wyoming"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@us\/117605168803933746","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/posts\/137705","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/comments?post=137705"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/posts\/137705\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/media\/137706"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/media?parent=137705"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/categories?post=137705"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/tags?post=137705"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}