{"id":45683,"date":"2026-10-07T02:08:09","date_gmt":"2026-10-07T02:08:09","guid":{"rendered":"https:\/\/www.europesays.com\/thestates\/45683\/"},"modified":"2026-10-07T02:08:09","modified_gmt":"2026-10-07T02:08:09","slug":"eckert-road-bridge-in-boise-to-close-next-week-for-two-year-replacement-project","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/thestates\/45683\/","title":{"rendered":"Eckert Road Bridge in Boise to close next week for two-year replacement project"},"content":{"rendered":"<p>SOUTHEAST BOISE, Idaho \u2014 The Ada County Highway District will begin a major reconstruction project on the Eckert Road Bridge in southeast Boise next week.<\/p>\n<p>The project will close the bridge for about two years to make upgrades to the area and will significantly alter travel patterns for thousands of drivers.<\/p>\n<p>The bridge, which connects Barber Valley to the rest of southeast Boise near Barber Park, underwent emergency repairs last year after ACHD discovered structural issues with its wooden supports. While those repairs allowed the bridge to reopen temporarily, officials said a full replacement is necessary.<\/p>\n<p>\u201cWe\u2019re construction-ready right now,\u201d said Dave Rader, ACHD&#8217;s project manager for the project. \u201cThe interim repair work was just that it was a Band-Aid and the whole bridge still needs to be replaced.&#8221;<\/p>\n<p class=\"cms-textAlign-center\">WATCH: Neighborhood Reporter Brady Caskey breaks down the upgrades slated as part of the Eckert Bridge Project<\/p>\n<p>Eckert Road Bridge in Boise to close next week for two-year replacement project<\/p>\n<p>More than 7,300 vehicles cross the bridge on an average day, according to an ACHD traffic study. Once construction begins, traffic will be detoured to other crossings, like Parkcenter Boulevard, Highway 21 and Warm Springs Road.<\/p>\n<p>\u201cJust expect a longer commute and less connectivity,\u201d Rader said.<\/p>\n<p>The project includes more than just a bridge replacement. Plans call for a new single-lane roundabout at Boise Avenue and Eckert Road, plus a wider bridge with a center turn lane, and expanded pathways for bicyclists and pedestrians.<\/p>\n<p>The project also includes a Greenbelt connection tunnel that will link to the city\u2019s new Alta Harris Park on the north side of the Boise River.<\/p>\n<p>\u201cMore space to move for pedestrians and bikes and more space to be out of the way of vehicles on the roadway with the Greenbelt underpass so there will be some really nice improvements coming with the project,\u201d Rader said.<\/p>\n<p>Some neighbors expressed concerns about plans to remove about 35 trees in and around Barber Park to accommodate construction. ACHD officials said every tree removed for the project will be replaced.<\/p>\n<p><a class=\"Link\" href=\"https:\/\/engage.achdidaho.org\/eckertbridge\" target=\"_blank\" rel=\"nofollow noopener\">You can find more information about the Eckert Road Bridge Project here.<\/a><\/p>\n<p>Send tips to neighborhood reporter Brady Caskey<\/p>\n<p>Have a story idea from South Boise, West Boise or Kuna? Share it with Brady below \u2014<\/p>\n","protected":false},"excerpt":{"rendered":"SOUTHEAST BOISE, Idaho \u2014 The Ada County Highway District will begin a major reconstruction project on the Eckert&hellip;\n","protected":false},"author":2,"featured_media":45684,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[38],"tags":[19748,40011,39505,40022,40015,40014,11802,40020,40013,40023,40019,40017,40012,40016,40021,11224,39514,40018,33411],"class_list":["post-45683","post","type-post","status-publish","format-standard","has-post-thumbnail","category-idaho","tag-achd","tag-achd-will-begin-a-major-reconstruction-project-on-the-eckert-road-bridge-in-southeast-boise-next-week-the-project-will-close-the-bridge-for-about-two-years-to-make-upgrades-to-the-area","tag-ada-county-highway-district","tag-alta-harris-park","tag-barber-park","tag-barber-valley","tag-boise","tag-boise-avenue-roundabout","tag-boise-bridge-project","tag-boise-infrastructure-project","tag-boise-road-construction","tag-boise-traffic-detours","tag-eckert-road-bridge","tag-eckert-road-closure","tag-greenbelt-tunnel","tag-idaho","tag-idaho-transportation","tag-parkcenter-boulevard","tag-southeast-boise"],"share_on_mastodon":{"url":"","error":"Validation failed: Text character limit of 500 exceeded"},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/posts\/45683","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/comments?post=45683"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/posts\/45683\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/media\/45684"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/media?parent=45683"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/categories?post=45683"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/tags?post=45683"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}