{"id":72941,"date":"2026-10-18T19:41:08","date_gmt":"2026-10-18T19:41:08","guid":{"rendered":"https:\/\/www.europesays.com\/thestates\/72941\/"},"modified":"2026-10-18T19:41:08","modified_gmt":"2026-10-18T19:41:08","slug":"sjta-breaks-ground-on-400m-atlantic-city-expressway-widening-project","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/thestates\/72941\/","title":{"rendered":"SJTA breaks ground on $400M Atlantic City Expressway widening project"},"content":{"rendered":"<p>\nThe basics:<\/p>\n<p>SJTA broke ground on $400 million project to widen the Atlantic City Expressway<br \/>\nThree-phase project will add third lane in each direction between mileposts 31.6 and 44.2<br \/>\nConstruction expected to begin in 2027; phase one projected to take nearly two years<br \/>\nProject aims to ease summer traffic congestion, improve roadway safety, support regional mobility. <\/p>\n<p>The <a href=\"https:\/\/www.sjta.com\/\" target=\"_blank\" rel=\"noopener nofollow\">South Jersey Transportation Authority<\/a> broke ground this week on the beginning of a three-phase project to expand the Atlantic City Expressway to three lanes.\n<\/p>\n<p>SJTA Executive Director Stephen Dougherty; U.S. Rep. Donald Norcross, D-N.J.; SJTA Vice Chair Barbara Holcomb and others were in attendance to celebrate this $400 million project.\n<\/p>\n<p>\u201cThis project, without a doubt, is a significant investment to one of South Jersey\u2019s most important transportation asset,\u201d said Holcomb. \u201cA project of this magnitude doesn\u2019t happen overnight. It requires years of planning, engineering coordination, financial management and problem solving.\u201d\n<\/p>\n<p>Norcross told NJBIZ that while $400 million is necessary for this type of work, which he believes should have been done 10 years ago, the return on investment will go right back to those who use the roads.\n<\/p>\n<p>\u201cThe interesting part about this, this is funded <a href=\"https:\/\/njbiz.com\/atlantic-city-expressway-electronic-toll-launch\/\" target=\"_blank\" rel=\"noopener nofollow\">through tolls<\/a>, not through direct revenue through the state. There is some additional money, but not significant amounts of the people who use it are paying for it directly. That\u2019s a direct return to those who use it,\u201d Norcross said.<\/p>\n<p>The road ahead<\/p>\n<p>The project will create a third lane for both sides of the ACE. It will begin at milepost 31.6 and will run through milepost to the western terminus of State Highway 42\u2019s milepost 44.2.<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"wp-image-569200 size-full\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"The three-phase Atlantic City Expressway widening project, pictured here at the ground breaking event on poster boards, will expand the roadway to three lanes.\" width=\"875\" height=\"535\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.europesays.com\/thestates\/wp-content\/uploads\/2026\/10\/20261014_103612.jpg\"\/><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-569200 size-full\" src=\"https:\/\/www.europesays.com\/thestates\/wp-content\/uploads\/2026\/10\/20261014_103612.jpg\" alt=\"The three-phase Atlantic City Expressway widening project, pictured here at the ground breaking event on poster boards, will expand the roadway to three lanes.\" width=\"875\" height=\"535\"  \/>The three-phase Atlantic City Expressway widening project, pictured here at the ground breaking event on poster boards, will expand the roadway to three lanes. \u2013 NICK BUTLER\/NJBIZ\n<\/p>\n<p>\u201cToday, we are officially beginning the next major chapter in the history of our road. The Atlantic City Expressway has been connecting South Jersey for more than 60 years. It connects our communities, it brings visitors to Atlantic City and the Jersey Shore,\u201d said Dougherty. \u201cIt carries people to work, it connects businesses, customers and supports tourism commerce and economic activity throughout this region.\u201d\n<\/p>\n<p>According to the ACE widening project overview, the need has become crucial to help alleviate congestion, especially during the summer travel periods, which has experienced an excessively high number of car accidents.\n<\/p>\n<p>Traffic talk<\/p>\n<p>Dougherty told NJBIZ that construction is expected to begin in 2027. And commuters shouldn\u2019t see disruption in the flow of traffic.\n<\/p>\n<p>\u201cWe\u2019re always adjusting the construction schedule around what our traffic looks like. So, when there\u2019s peak season of what we historically say are 100 days of summer, Memorial Day to Labor Day, there\u2019s certain construction we wouldn\u2019t do, because we don\u2019t want it to impact the traffic,\u201d Dougherty said. \u201cOur goal \u2013 and we think this is highly attainable \u2013 that we\u2019ll have two lanes open in operational in each direction through the entirety of the project.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-569197\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"U.S. Rep. Donald Norcross, D-1st District, speaks during the groundbreaking event for the Atlantic City Expressway widening project in October 2026. -NICK BUTLER\/NJBIZ\" width=\"500\" height=\"306\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.europesays.com\/thestates\/wp-content\/uploads\/2026\/10\/20261014_102255.jpg\"\/><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-569197\" src=\"https:\/\/www.europesays.com\/thestates\/wp-content\/uploads\/2026\/10\/20261014_102255.jpg\" alt=\"U.S. Rep. Donald Norcross, D-1st District, speaks during the groundbreaking event for the Atlantic City Expressway widening project in October 2026. -NICK BUTLER\/NJBIZ\" width=\"500\" height=\"306\"  \/>U.S. Rep. Donald Norcross, D-1st District, speaks during the groundbreaking event for the Atlantic City Expressway widening project in October 2026. He called the project a \u201cdirect return\u201d for those who travel the roadway.\u00a0 -NICK BUTLER\/NJBIZ<\/p>\n<p>While he said that phase one of this project will most likely take almost two years to complete, the goal is to get it done sooner.\n<\/p>\n<p>\u201cObviously, we want to meet our commitment of having it break ground to fully operational on a schedule that we think we can meet if there\u2019s opportunities where we can still operate it efficiently and safely, and there\u2019s opportunity for us to advance some work,\u201d Dougherty said. \u201cWe just don\u2019t want to impact the customer who\u2019s driving the road, whether it\u2019s part of our commuters or your vacationers, long weekenders, or day trippers.\u201d\n<\/p>\n<p>The goals and objectives of the ACE widening project are to:<\/p>\n<p>Mitigate summer traffic congestion along the corridor and increase mobility in the South Jersey and Philadelphia Region<br \/>\nIncrease coastal resilience in the region<br \/>\nCreate a safe corridor for ACE users<br \/>\nProvide enhanced accommodation for emergency evacuation purposes<br \/>\nEliminate as many existing substandard geometric features as possible and update roadway to the latest standards where practical<br \/>\nImprove the quality of life for residents and businesses along the ACE corridor and the feeder roadway network, particularly during summer months<br \/>\nImprove access to employment by improving mobility<br \/>\nSupport efforts to increase the economic competitiveness of the Philadelphia and South Jersey region<br \/>\nReduce air and noise pollution resulting from summer traffic congestion along the corridor<br \/>\nAvoid and minimize adverse impacts to sensitive environmental and cultural resources<br \/>\nImplement a cost-effective and financially feasible alternative<\/p>\n<p>\t Keep exploring this topic<\/p>\n","protected":false},"excerpt":{"rendered":"The basics: SJTA broke ground on $400 million project to widen the Atlantic City Expressway Three-phase project will&hellip;\n","protected":false},"author":2,"featured_media":72942,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[12],"tags":[49013,56746,34475,3771,2002,49015,56747,56748,49017,39509],"class_list":["post-72941","post","type-post","status-publish","format-standard","has-post-thumbnail","category-new-jersey","tag-atlantic-city-expressway","tag-donald-norcross","tag-groundbreaking","tag-infrastructure","tag-new-jersey","tag-road-construction","tag-south-jersey-infrastructure","tag-south-jersey-transportation","tag-south-jersey-transportation-authority","tag-traffic-congestion"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@us\/117463619186204954","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/posts\/72941","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/comments?post=72941"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/posts\/72941\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/media\/72942"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/media?parent=72941"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/categories?post=72941"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/thestates\/wp-json\/wp\/v2\/tags?post=72941"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}