The practice shared images of its proposals for 99-101 Newington Causeway, Elephant and Castle, at a public consultation event in late June.

Backed by developer Arada, the scheme would see demolition of an existing building that was vacated by the Salvation Army three years ago, following the organisation’s move to its new TateHindle-designed headquarters in nearby Denmark Hill.

In its place, PLP proposes a residential tower featuring en suite bedrooms alongside shared lounges, kitchens and dining areas as well as co-working and fitness spaces.

Consultation documents suggest the planned co-living tower will reach a similar height to Allies and Morrison’s 41-storey Two Fifty One building opposite the site, which completed in 2017.

A separate building would include a hotel. A café and new public plaza are also proposed.

Consultation boards displayed at the end of last month outlined landscaping measures such as introduction of trees, public seating, gardens and a ‘green passage’ through the site.

They added that the proposed buildings’ appearance had been informed by the architecture of the road and wider Elephant & Castle district.

‘The façade design uses a simple and consistent palette of materials, with vertical elements helping to break down the scale of the buildings,’ said the consultation.

Sustainability measures include air source heat pumps, solar panels, green roofs and energy-efficient design, according to the boards.

A website for the project states that it offers ‘an opportunity to bring the vacant site back into active use while recognising its long association with the Salvation Army and its contribution to the local community’.

It adds that the 10 storey-high 1980s existing office building ‘no longer meets modern workplace standards’ and would require significant investment to remain in use.

‘The layout is outdated and difficult to adapt,’ said the project website, adding: ‘Building systems would require major investment to replace.’

It adds that the height of the proposed buildings had been ‘carefully considered’ in the context of existing and approved developments in the locality.

PLP said it hoped to submit a planning application later this summer.