The four-year framework for public sector clients encompasses both permanent and rental modular solutions.
It will be used for schools and healthcare jobs as well as residential newly introduced in the third iteration of the framework.
This includes standard and bespoke buildings tailored to the needs of the education, healthcare, and wider public sectors.
NHS SBS’s Modular Buildings 3
The lotting structure for the NHS SBS, which includes local authorities, sees the introduction of residential for the first time, while a specialised kitchen lot is dropped.
The previous generation framework being replaced saw 9 firms drop out or collapse from the original lineup.
Stephen Clayton, preconstruction director at McAvoy said, “Being reappointed to the NHS SBS Framework for a third term is a significant achievement for McAvoy.
“We’re proud to continue supporting the UK public sector with innovative modular solutions that prioritise sustainability, quality, and speed of delivery.”