{"id":1092202,"date":"2026-07-16T05:28:20","date_gmt":"2026-07-16T05:28:20","guid":{"rendered":"https:\/\/www.europesays.com\/uk\/1092202\/"},"modified":"2026-07-16T05:28:20","modified_gmt":"2026-07-16T05:28:20","slug":"uk-entr-and-unitech-power-systems-to-support-scotlands-bellrock-offshore-wind-farm","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/uk\/1092202\/","title":{"rendered":"UK: Entr and Unitech Power Systems to support Scotland\u2019s Bellrock Offshore Wind Farm"},"content":{"rendered":"<p><img decoding=\"async\" src=\"https:\/\/www.europesays.com\/uk\/wp-content\/uploads\/2026\/07\/224145_8cad3b67171b4f70a922.jpg\" alt=\"Photo - see caption\" class=\"articleimage\"\/><\/p>\n<p><a href=\"https:\/\/www.akersolutions.com\/\" rel=\"nofollow noopener\" target=\"_blank\">Aker Solutions\u2019<\/a> consultancy arm, Entr and its wholly owned subsidiary Unitech Power Systems have been awarded a contract by Nadara, one of Europe\u2019s largest renewable-energy independent power producers. The contract is for electrical infrastructure studies for the proposed 1.8 GW <strong>Bellrock Offshore Wind Farm<\/strong>, 120km off the coast of Aberdeenshire, Scotland.<\/p>\n<p><img decoding=\"async\" alt=\"\" src=\"https:\/\/www.europesays.com\/uk\/wp-content\/uploads\/2026\/07\/bellrock-nadara-16x9.png\" style=\"width:700px\"\/><\/p>\n<p>The studies will support the development of a high-level electrical infrastructure concept for Bellrock, helping to define an optimised solution across the project\u2019s full electrical transmission system, from offshore generation through to onshore grid connection.\u00a0<\/p>\n<p>The project has the potential to make a significant contribution to Scotland and the UK\u2019s renewable power ambitions, while supporting the growth of the floating offshore wind supply chain.\u00a0<\/p>\n<p>Entr and Unitech Power Systems will assess multiple transmission configurations, alongside key elements of the project\u2019s electrical system including inter-array cabling, offshore and onshore substations, export cables and grid integration.\u00a0<\/p>\n<p>The studies will provide cost, schedule and supply chain insights to support procurement planning, refine Bellrock\u2019s electrical infrastructure concept and to reduce risk as the project moves through future design, consenting and investment milestones.\u00a0<\/p>\n<p>Entr will bring project execution experience and real-world data to the study, while Unitech Power Systems will contribute specialist electrical power engineering capability. Together, the companies will help inform key investment decisions and establish a robust foundation for future design, procurement and delivery.\u00a0<\/p>\n<p>&#8216;Floating offshore wind has a major role to play in the energy transition, and robust early-stage design will be key to enabling projects to move forward with confidence,&#8217;\u00a0said <strong>Dorthe Kirkeby, Vice President of Ocean and Wind at Entr, Aker Solution<\/strong>s.\u00a0<\/p>\n<p>&#8216;Early definition of the transmission system is essential to managing cost, schedule and technical risk on projects of this scale. Through Entr and Unitech Power Systems, we will combine project execution insight with deep electrical power engineering expertise to help identify a practical, optimised and future-ready concept for Bellrock,&#8217;\u00a0said <strong>Kirkeby<\/strong>.\u00a0\u00a0<\/p>\n<p><strong>David Robertson, Portfolio Director at Nadara<\/strong>, said: &#8216;This study is about making the right technical decisions early. By working with Entr and Unitech Power Systems, we are bringing together strong offshore project experience and specialist electrical engineering capability at a critical stage in Bellrock\u2019s development.\u00a0<\/p>\n<p>&#8216;The work will help us assess the most robust and efficient transmission options, understand key cost and programme considerations, and build a stronger evidence base for future investment and procurement decisions.&#8217;\u00a0<\/p>\n<p>Bellrock\u2019s Wind Farm Development Area consent application was submitted in April 2026 and is now progressing through the determination process. Further work is continuing across the project\u2019s offshore and onshore transmission infrastructure, including engineering design, surveys, site selection and stakeholder engagement.\u00a0<\/p>\n<p>Subject to the necessary consents and approvals, the project will move through further transmission consenting, procurement preparation and investment decision stages, with the electrical concept study helping to refine the project\u2019s future transmission design.\u00a0<\/p>\n<p><a href=\"https:\/\/www.akersolutions.com\/news\/news-archive\/2026\/entr-and-unitech-power-systems-to-support-scotlands-bellrock-offshore-wind-farm\/\" rel=\"nofollow noopener\" target=\"_blank\">Original announcement link<\/a><\/p>\n<p>Source: Aker Solutions<\/p>\n","protected":false},"excerpt":{"rendered":"Aker Solutions\u2019 consultancy arm, Entr and its wholly owned subsidiary Unitech Power Systems have been awarded a contract&hellip;\n","protected":false},"author":2,"featured_media":1092203,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[3,4],"tags":[13148,748,5360,13137,35,13142,13141,393,5433,13143,13144,13147,4884,13149,5379,897,13151,13146,13152,1144,5346,2661,13150,13138,13153,13154,13140,712,13145,16,15,13139,1764],"class_list":["post-1092202","post","type-post","status-publish","format-standard","has-post-thumbnail","category-uk","category-united-kingdom","tag-alternative-energy","tag-britain","tag-drilling","tag-e-p-news","tag-energy","tag-energy-pedia","tag-energy365","tag-england","tag-exploration-and-production","tag-farmin","tag-farmout","tag-geological-and-geophysical","tag-great-britain","tag-heavy-oil","tag-hydrocarbon","tag-jobs","tag-licence-round","tag-licensing","tag-noc","tag-northern-ireland","tag-offshore","tag-oil","tag-oil-and-gas-condensate","tag-oil-and-gas-exploration","tag-oil-and-gas-ministry","tag-oil-companies","tag-rig","tag-scotland","tag-seismic","tag-uk","tag-united-kingdom","tag-upstream","tag-wales"],"share_on_mastodon":{"url":"","error":"Validation failed: Text character limit of 500 exceeded"},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/posts\/1092202","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/comments?post=1092202"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/posts\/1092202\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/media\/1092203"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/media?parent=1092202"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/categories?post=1092202"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/tags?post=1092202"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}