{"id":1104234,"date":"2026-07-22T09:00:22","date_gmt":"2026-07-22T09:00:22","guid":{"rendered":"https:\/\/www.europesays.com\/uk\/1104234\/"},"modified":"2026-07-22T09:00:22","modified_gmt":"2026-07-22T09:00:22","slug":"sinexcels-grid-forming-pcs-for-european-bess-projects","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/uk\/1104234\/","title":{"rendered":"SINEXCEL&#8217;s grid-forming PCS for European BESS projects"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Luke Lu: For this Intersolar exhibition, our focus is\u00a0utility-scale. We\u2019re bringing our\u00a0utility-scale flagship product StellaON, and with that, we are aiming at\u00a0GW-level utility-scale projects.<\/p>\n<p class=\"wp-block-paragraph\">Today, the trend is that batteries are getting bigger, and the scale of projects is getting bigger. So we use a\u00a0centralised power conversion system \u2013 each unit can be up to\u00a01.5MW, and you can put four or eight in parallel, so you can go to\u00a010MW or 12MW\u00a0per block.<\/p>\n<p class=\"wp-block-paragraph\"><strong>Grid-forming (GFM) capability is another big topic in Europe. Why is it so important, and how have you designed StellaON with that in mind?<\/strong><\/p>\n<p class=\"wp-block-paragraph\">We have been talking about\u00a0grid-forming\u00a0for a long time, but now it is moving from a topic of discussion to, I would say, a\u00a0ticket for energy storage to enter utility-scale. In\u00a0China, the government has already published a\u00a0GB standard for grid-forming, and in Europe we have emerging requirements like\u00a0NC RfG 2.0 [published by the association of transmission system operators, ENTSO-E]. Across\u00a0Latin America\u00a0and\u00a0Japan, you also see new regulations. So it\u2019s no longer just an idea; it\u2019s becoming a\u00a0formal requirement.<\/p>\n<p class=\"wp-block-paragraph\">We can regard\u00a0grid-forming\u00a0as an\u00a0upgrade\u00a0from traditional\u00a0grid-following\u00a0operation. You still keep functions like frequency regulation and market trading, but now the PCS has to\u00a0support the grid, not just inject power. There are three key differences we designed for:<\/p>\n<ol class=\"wp-block-list\">\n<li>Overload capability. You need to handle\u00a0inrush currents and short-term surges. For StellaON we did a lot of\u00a0redundancy design at the component level, so the PCS can withstand at least\u00a01.5 times rated current for 60 seconds. That kind of overload performance is essential for stability under faults and dynamic events. Whereas the industry can only do 1.2x times for 60 seconds. For project owners, this helps improve fault ride-through performance and system resilience. Instead of disconnecting immediately during a disturbance, the PCS can continue supporting the grid during critical transient conditions.<\/li>\n<li>Virtual synchronous generator (VSG) behaviour. We simulate how traditional\u00a0synchronous generators, like diesel gensets, behave \u2013 they rotate and provide inertia and voltage support. We implemented\u00a0VSG functions\u00a0in the PCS, and this is built on experience from\u00a0thousands of commercial and industrial (C&amp;I) and microgrid projects\u00a0where customers combine diesel, PV and batteries to supply a whole village or industrial park. That experience directly feeds into our\u00a0grid-forming control algorithms\u00a0for utility-scale.<\/li>\n<li>Black start: After the blackouts in\u00a0Spain in 2025, there was a lot of concern about large-scale outages in Europe.\u00a0Black start capability\u00a0becomes essential: imagine\u00a0GW-scale storage\u00a0that must restore power to a city. We have tested scenarios where\u00a0a 1MW PCS starts a 10MW transformer\u00a0\u2013 a\u00a01:10 ratio\u00a0\u2013 demonstrating that storage can support\u00a0massive-scale restart\u00a0of the grid.<\/li>\n<\/ol>\n<p class=\"wp-block-paragraph\">We have already fully tested StellaON under the\u00a0Chinese GB grid-forming standard, so we feel\u00a0quite confident\u00a0in meeting the new requirements that are coming in Europe as well.<\/p>\n<p class=\"wp-block-paragraph\"><strong>The new platform comes in 1250K and 1575K variants. What\u2019s the thinking behind those ratings?<\/strong><\/p>\n<p class=\"wp-block-paragraph\">We set\u00a0two power levels: 1250 and 1575. The explanation is about\u00a0matching battery evolution.<\/p>\n<p class=\"wp-block-paragraph\">Right now, the mainstream market size of a battery block is about\u00a05MWh, so that\u2019s why we set 1250K \u2013 if we put\u00a0two in parallel, we can easily assemble a\u00a0simple 2-hour system. But the next stage of the battery will go above\u00a06MWh and beyond, so the\u00a01575K\u00a0is prepared\u00a0for the future, while\u00a0the 1250K is for now.<\/p>\n<p class=\"wp-block-paragraph\">For utility-scale, you also care about\u00a0footprint, so our turnkey solution offers\u00a05MW in a 20-foot container\u00a0and\u00a012.5MW in a 40-foot container. That compactness lets customers better use valuable land and simplify installation and commissioning \u2013 all of which helps save costs.<\/p>\n<p class=\"wp-block-paragraph\">This is closely linked to\u00a0project economics. Everyone cares about better IRR, better returns. They use batteries with\u00a0higher energy and power density; that\u2019s the trend on both capex and lifecycle cost. We designed these power levels around those economic and technical trends.<\/p>\n<p class=\"wp-block-paragraph\"><strong>One issue we hear a lot about in Europe is noise. How does StellaON address increasingly strict acoustic regulations?<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"533\" height=\"800\" src=\"https:\/\/www.europesays.com\/uk\/wp-content\/uploads\/2026\/07\/DSC060823.jpg\" alt=\"\" class=\"wp-image-105356\" style=\"aspect-ratio:0.6662434813179945;width:374px;height:auto\"  \/>SINEXCEL display of utility-scale and C&amp;I BESS solutions. Image: SINEXCEL<\/p>\n<p class=\"wp-block-paragraph\">Before, noise was something manufacturers didn\u2019t really care about, but now, because of regulations in Europe, it\u2019s become really important.<\/p>\n<p class=\"wp-block-paragraph\">In Europe, and especially in countries like\u00a0Germany, you have very strict\u00a0noiserequirements. We\u2019ve seen cases in Germany where storage projects faced fines or restrictions on nighttime operation because their noise levels exceeded local regulations. So for developers, EPCs and investors, noise is now a\u00a0critical issue.<\/p>\n<p class=\"wp-block-paragraph\">That\u2019s why with StellaON we put a lot of emphasis on\u00a0acoustic engineering. Our laboratory testing shows that its operating noise can be as low as 65dB under specified test conditions. Our goal isn\u2019t simply to build a quieter PCS\u2014it\u2019s to help customers reduce acoustic mitigation costs, simplify permitting and maximise project availability.<\/p>\n<p class=\"wp-block-paragraph\">Beyond noise, thermal derating is another factor that can erode project profitability. Many conventional PCS products begin to derate as temperatures rise, leading to power loss and forcing developers to oversize equipment.<\/p>\n<p class=\"wp-block-paragraph\">StellaON 1250K\/1575K delivers continuous output at 55-10\u00b0C above the industry average, eliminating 15-20% power derating while reducing oversizing costs by up to 20%, ultimately improving overall project economics.<\/p>\n<p class=\"wp-block-paragraph\"><strong>How far along are you with deployments of StellaON, particularly in Europe, and what have you learned so far?<\/strong><\/p>\n<p class=\"wp-block-paragraph\">For StellaON, we have already delivered\u00a0around 15 projects across Europe, Asia-Pacific, and Africa, while order intake reached 500MW in the first half of 2026. It has been successfully grid-connected in Vietnam this March, operating reliably under high-temperature and high-humidity conditions and demonstrating its adaptability in demanding environments.<\/p>\n<p class=\"wp-block-paragraph\">It is certified for Germany, Poland, the Netherlands, Belgium, and Romania, with Spain and the US approvals expected soon.<\/p>\n<p class=\"wp-block-paragraph\">So far, we see the strongest utility-scale demand in\u00a0Eastern Europe. Those markets are growing really fast for utility-scale storage. In\u00a0Western Europe, we still see a lot of what we call\u00a0\u201cbig C&amp;I\u201d\u00a0\u2013 larger factories and commercial parks using\u00a02\u20135MWh\u00a0systems at medium voltage. StellaON is being used in both kinds of applications, and those projects are where we continuously\u00a0refine our grid-forming, overload and noise performance\u00a0based on real operating data.<\/p>\n<p class=\"wp-block-paragraph\"><strong>As you grow your installed base in Europe, what does SINEXCEL\u2019s O&amp;M and localisation strategy look like \u2013 and why is that so critical?<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"533\" height=\"800\" src=\"https:\/\/www.europesays.com\/uk\/wp-content\/uploads\/2026\/07\/DSC06082.jpg\" alt=\"\" class=\"wp-image-105358\" style=\"aspect-ratio:0.6662434813179945;width:381px;height:auto\"  \/>The StellaON PCS is already fully tested to Chinese GFM standards. Image: SINEXCEL<\/p>\n<p class=\"wp-block-paragraph\">We have a\u00a0European office in D\u00fcsseldorf, which is our business hub for Europe covering sales, aftersales, and technical support, but behind that we have\u00a020 or more service centres and partners around the globe, including Europe,\u00a0North America, Latin America and APAC.<\/p>\n<p class=\"wp-block-paragraph\">We have built these service centres to provide fast response times\u00a0for on-site issues, local spare parts stock, so we can\u00a0deliver parts within about a week\u00a0if a project needs a replacement and on-site commissioning support\u00a0for every project, with our own SINEXCEL team.<\/p>\n<p class=\"wp-block-paragraph\">At Intersolar, we have also\u00a0signed several partnerships with after-sales service companies\u00a0as long-term partners for Europe. That extends our coverage and ensures customers have\u00a0robust, long-term O&amp;M support.<\/p>\n<p class=\"wp-block-paragraph\">For energy storage,\u00a0time is money. If a system shuts down for one hour, two hours, or even one month, how much money will be wasted just waiting for maintenance? That\u2019s why we have\u00a0dozens of maintenance people based around Europe, travelling from site to site for\u00a0regular maintenance and troubleshooting.<\/p>\n<p class=\"wp-block-paragraph\"><strong>Finally, how do you see SINEXCEL\u2019s role in Europe over the next few years?<\/strong><\/p>\n<p class=\"wp-block-paragraph\">Europe will be one of SINEXCEL\u2019s most important markets over the next three to five years.<\/p>\n<p class=\"wp-block-paragraph\">As the market moves toward utility-scale storage, the role of the PCS is also changing. It is no longer simply a power conversion device. Its grid-support and grid-forming capabilities and reliability increasingly determine whether a project can capture market revenues and operate reliably over its lifetime.<\/p>\n<p class=\"wp-block-paragraph\">With StellaON, SINEXCEL aims to combine advanced grid-forming technology, proven power electronics expertise and stronger local service capabilities. Our goal is to help developers, EPCs and asset owners turn utility-scale storage into a reliable, revenue-generating part of Europe\u2019s power system.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.europesays.com\/uk\/wp-content\/uploads\/2026\/07\/DSC06242-2-1024x683.jpg\" alt=\"\" class=\"wp-image-105355\" style=\"aspect-ratio:1.4992888417882142;width:787px;height:auto\"  \/>Image: SINEXCEL<\/p>\n","protected":false},"excerpt":{"rendered":"Luke Lu: For this Intersolar exhibition, our focus is\u00a0utility-scale. We\u2019re bringing our\u00a0utility-scale flagship product StellaON, and with that,&hellip;\n","protected":false},"author":2,"featured_media":1104235,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[5174],"tags":[14729,2000,299,5187,55223,301391,165752,10123,301392,129389,12793,301393],"class_list":["post-1104234","post","type-post","status-publish","format-standard","has-post-thumbnail","category-eu","tag-certification","tag-eu","tag-europe","tag-european","tag-footprint","tag-gfm","tag-grid-forming","tag-noise","tag-operations-and-maintenance","tag-pcs","tag-power-electronics","tag-sinexcel"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@uk\/116962817876160832","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/posts\/1104234","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/comments?post=1104234"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/posts\/1104234\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/media\/1104235"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/media?parent=1104234"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/categories?post=1104234"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/tags?post=1104234"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}