{"id":1277685,"date":"2026-10-27T15:23:16","date_gmt":"2026-10-27T15:23:16","guid":{"rendered":"https:\/\/www.europesays.com\/uk\/1277685\/"},"modified":"2026-10-27T15:23:16","modified_gmt":"2026-10-27T15:23:16","slug":"network-rail-vegetation-inspection-takes-2-months-in-edinburgh","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/uk\/1277685\/","title":{"rendered":"Network Rail vegetation inspection takes 2 months in Edinburgh"},"content":{"rendered":"<p class=\"publish-date mb-4\">&#13;<br \/>\n        &#13;<br \/>\n            Published October 27, 2026        &#13;\n    <\/p>\n<p>A Network Rail vegetation inspection cycle in Edinburgh that previously took three years has been completed in two months, with engineers reviewing train-captured video instead of walking the track.<\/p>\n<p><a href=\"https:\/\/www.europesays.com\/uk\/wp-content\/uploads\/2026\/10\/network-rail-dli-edinburgh-engineer.webp\"><img data-rws-image-box=\"1600x900\" style=\"width:min(100%,1600px);height:auto;aspect-ratio:1600\/900;\" fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-193031\" src=\"https:\/\/www.europesays.com\/uk\/wp-content\/uploads\/2026\/10\/network-rail-dli-edinburgh-engineer.webp\" alt=\"Network Rail engineer reviewing Digitised Lineside Inspection tool with train video and vegetation map on screen\" width=\"1600\" height=\"900\"  \/><\/a>Network Rail engineer reviewing Digitised Lineside Inspection footage and map at Edinburgh depot. Photo: Network Rail<\/p>\n<p>The work uses <a href=\"https:\/\/www.networkrailmediacentre.co.uk\/news\/new-digital-tool-helps-engineers-complete-three-year-inspection-in-two-months\" rel=\"nofollow noopener\" target=\"_blank\">Digitised Lineside Inspection (DLI)<\/a>. Engineers review footage captured from trains to see the vegetation along the line, pick out potential problems and plan any necessary work from the depot.<\/p>\n<p>Edinburgh coverage and trackside safety<\/p>\n<p>The inspections covered the Edinburgh teams\u2019 section of the network, including stretches of the East Coast Main Line, which links Edinburgh with London King\u2019s Cross.<\/p>\n<p>Working this way cuts the number of trips onto the track, where special access arrangements are needed for staff to work safely, and reduces their exposure to the risks of an operational railway. Network Rail puts the direct savings in Edinburgh at around \u00a355,000.<\/p>\n<p>The approach is also in use through autumn, when falling leaves can cause problems for trains. Spotting issues earlier lets teams direct work to the locations that need it.<\/p>\n<p>Tracy Penmen, track maintenance engineer at Network Rail Scotland, said:<\/p>\n<blockquote>\n<p>\u201cIt also means less time spent out on the railway carrying out inspections and more time focused on the places that need our attention.\u201d<\/p>\n<\/blockquote>\n<p>DLI rollout across Network Rail<\/p>\n<p>DLI was developed by Network Rail\u2019s Technical Authority together with its research and development and intelligent infrastructure teams, and regions have been speeding up its adoption. An <a href=\"https:\/\/www.orr.gov.uk\/sites\/default\/files\/2026-07\/tar-network-rail-vegetation-workbank-planning-and-change-control-management.pdf\" rel=\"nofollow noopener\" target=\"_blank\">Office of Rail and Road review<\/a> dated June 18, 2026, describes a tool that combines synchronized forward-facing train video with LiDAR aerial imagery to identify vegetation encroaching on the line. Several regions told the regulator they expected full adoption to take 18 to 24 months, and some regional plans commit to raising the frequency of vegetation inspections from every three years to once a year when DLI is fully in use.<\/p>\n<p>Digitised Lineside Inspection (DLI) adoption at Network Rail, 2022\u20132026<\/p>\n<tr>\nDate<br \/>\nStage<br \/>\nSource<br \/>\n<\/tr>\n<tr>\nSeptember 30, 2022<\/p>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">Network Rail\u2019s Technical Authority expects DLI rollout in late Control Period 6 (to March 2024) and early Control Period 7 (from April 2024)<\/td>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\"><a href=\"https:\/\/www.orr.gov.uk\/sites\/default\/files\/2023-05\/review-of-vegetation-management-september-2022.pdf\" rel=\"nofollow noopener\" target=\"_blank\">Review of vegetation management, section 4.6.3<\/a><\/td>\n<\/tr>\n<tr>\nMarch 2026<\/p>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">End of Control Period 7 Year 2, by which the regulator expected all regions to complete plans to close gaps in vegetation condition data<\/td>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\"><a href=\"https:\/\/www.orr.gov.uk\/sites\/default\/files\/2026-07\/tar-network-rail-vegetation-workbank-planning-and-change-control-management.pdf\" rel=\"nofollow noopener\" target=\"_blank\">Office of Rail and Road review, paragraph 135<\/a><\/td>\n<\/tr>\n<tr>\nJune 18, 2026<\/p>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">Several regions expect full DLI adoption to take 18 to 24 months, and some regional plans aim to move vegetation inspections from every three years to annual<\/td>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\"><a href=\"https:\/\/www.orr.gov.uk\/sites\/default\/files\/2026-07\/tar-network-rail-vegetation-workbank-planning-and-change-control-management.pdf\" rel=\"nofollow noopener\" target=\"_blank\">Office of Rail and Road review, paragraphs 93 and 139<\/a><\/td>\n<\/tr>\n<tr>\nOctober 26, 2026<\/p>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">Network Rail reports that Edinburgh teams used DLI to finish in two months a round of vegetation inspections that previously took three years<\/td>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\"><a href=\"https:\/\/www.networkrailmediacentre.co.uk\/news\/new-digital-tool-helps-engineers-complete-three-year-inspection-in-two-months\" rel=\"nofollow noopener\" target=\"_blank\">Network Rail<\/a><\/td>\n<\/tr>\n<p>Dates are document or announcement dates, except March 2026, the deadline by which the regulator expected regions to complete plans to close the data gaps. The 18 to 24 months is an expectation several regions reported to the regulator in June 2026, not a fixed schedule. A national timetable for moving to annual inspections has not been published.<\/p>\n<p>            &#13;<\/p>\n<p class=\"rws-preferred-source__title\" id=\"rws-preferred-source-title-193030\">Prefer Railway Supply?<\/p>\n<p>&#13;<\/p>\n<p class=\"rws-preferred-source__text\">Add Railway Supply as a preferred source in Google.<\/p>\n<p>&#13;<br \/>\n        <a class=\"rws-preferred-source__button\" href=\"https:\/\/www.google.com\/preferences\/source?q=railway.supply\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">Add to preferred sources<\/a>&#13;<\/p>\n","protected":false},"excerpt":{"rendered":"&#13; &#13; Published October 27, 2026 &#13; A Network Rail vegetation inspection cycle in Edinburgh that previously took&hellip;\n","protected":false},"author":2,"featured_media":1277686,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[8816],"tags":[748,344016,1102,4884,1836,215005,712,16,15],"class_list":["post-1277685","post","type-post","status-publish","format-standard","has-post-thumbnail","category-edinburgh","tag-britain","tag-digital-railway-news","tag-edinburgh","tag-great-britain","tag-network-rail","tag-rail-transport-in-the-uk","tag-scotland","tag-uk","tag-united-kingdom"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@uk\/117513565583707863","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/posts\/1277685","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/comments?post=1277685"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/posts\/1277685\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/media\/1277686"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/media?parent=1277685"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/categories?post=1277685"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/tags?post=1277685"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}