{"id":1279354,"date":"2026-10-28T11:28:13","date_gmt":"2026-10-28T11:28:13","guid":{"rendered":"https:\/\/www.europesays.com\/uk\/1279354\/"},"modified":"2026-10-28T11:28:13","modified_gmt":"2026-10-28T11:28:13","slug":"birmingham-new-street-christmas-closure-brings-soho-renewal","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/uk\/1279354\/","title":{"rendered":"Birmingham New Street Christmas closure brings Soho renewal"},"content":{"rendered":"<p>Network Rail has published its travel plan for the Birmingham New Street Christmas closure, with no trains December 24\u201328 and a \u00a36.4m Soho junction and track renewal planned alongside.<\/p>\n<p><a href=\"https:\/\/www.europesays.com\/uk\/wp-content\/uploads\/2026\/10\/crosscountry-train-birmingham-new-street-snow.webp\"><img data-rws-image-box=\"1600x900\" style=\"width:min(100%,1600px);height:auto;aspect-ratio:1600\/900;\" fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-193139\" src=\"https:\/\/www.europesays.com\/uk\/wp-content\/uploads\/2026\/10\/crosscountry-train-birmingham-new-street-snow.webp\" alt=\"CrossCountry train at Birmingham New Street during snowfall\" width=\"1600\" height=\"900\"  \/><\/a>A CrossCountry train at Birmingham New Street during snowfall. Photo: CrossCountry.<\/p>\n<p>No trains will run to, from or through the station from Thursday, December 24, through Monday, December 28, 2026, and a full timetable returns on Tuesday, December 29. Christmas timetables and <a href=\"https:\/\/www.networkrailmediacentre.co.uk\/news\/christmas-travel-plan-your-journey-as-birmingham-new-street-prepares-for-major-upgrade\" rel=\"nofollow noopener\" target=\"_blank\">operator-by-operator alternatives<\/a> are now available.<\/p>\n<p>For passengers, the shutdown changes travel on three days: Christmas Eve, Sunday, December 27, and the bank holiday on Monday, December 28. As every year, the station has no trains on Christmas Day or Boxing Day. Network Rail suggests moving trips to dates outside the closure where possible but expects trains on either side of it to be more crowded than usual. Birmingham Snow Hill and Birmingham Moor Street will also be busier, and Christmas Eve services there will end early, as they do annually.<\/p>\n<p>Overhead line renewal and Soho track work<\/p>\n<p>The closure lets Network Rail start a \u00a313m program to renew the overhead line equipment on the approaches to and through New Street. Much of that wiring was installed in the 1960s, and the company says replacing it will cut the risk of faults and improve long-term reliability. This Christmas is the first of three phases, with further work planned for Christmas 2027 and Christmas 2028.<\/p>\n<p>The closure also carries other projects. Network Rail is spending \u00a36.4m to replace aging junction equipment and renew 800 meters of track at Soho. Track will also be renewed on the line between Birmingham and Sandwell and at Berkswell, between Birmingham and Coventry. At Berkswell, crews will install a new turnout linking the existing railway to new sidings, which will handle materials for later stages of HS2 construction. According to Network Rail, combining the jobs keeps overall disruption down and reduces the need to disrupt services again later.<\/p>\n<p>Mark Goodall, route director for Network Rail\u2019s Central route, explained the timing:<\/p>\n<blockquote>\n<p>\u201cWe\u2019re using the annual Christmas Day and Boxing Day shutdown to get as much essential work done as possible and minimise the overall disruption to passengers.\u201d<\/p>\n<\/blockquote>\n<p>Operator alternatives during the shutdown<\/p>\n<p>Five operators have set out alternatives. Avanti West Coast will run an amended timetable without calling at New Street, with replacement buses to Wolverhampton and to Birmingham International. CrossCountry trains will be amended or diverted to run between Coleshill Parkway and Stansted Airport, Nottingham and Cardiff Central, Edinburgh and Plymouth, and Manchester Piccadilly and Bournemouth, while buses connect New Street with Coleshill Parkway via Water Orton, with Worcestershire Parkway, and with Tamworth via Wilnecote.<\/p>\n<p>London Northwestern Railway services from London Euston and Northampton will start and finish at Birmingham International on December 27 and 28. Separate engineering on the West Coast route closes the line between Northampton and Rugby via Long Buckby from December 27, 2026, to January 1, 2027, with buses in place of trains. The operator\u2019s Crewe and Liverpool Lime Street trains will run only from Wolverhampton, at reduced frequency. From there, passengers can take a train to Sandwell &amp; Dudley, a bus to Smethwick Galton Bridge and a train to Birmingham Snow Hill, with up to five trains an hour on that last leg.<\/p>\n<p>West Midlands Railway will run no trains on the Cross City corridor between Lichfield Trent Valley or Four Oaks and Bromsgrove or Redditch, nor between New Street and Kings Norton via Kings Heath, with buses covering both. Its trains to Worcester Foregate Street, Great Malvern and Hereford will be <a href=\"https:\/\/www.nationalrail.co.uk\/engineering-works\/birmingham-new-street-24-dec-20261224\/\" rel=\"nofollow noopener\" target=\"_blank\">diverted to start and end at Birmingham Snow Hill<\/a>. Routes toward Rugeley Trent Valley, Shrewsbury and Walsall will be cut back to Wolverhampton or Sandwell &amp; Dudley at reduced frequency. Transport for Wales will not run between Wolverhampton and Birmingham International.<\/p>\n<p>How each operator runs during the Birmingham New Street closure, Dec. 24\u201328, 2026<\/p>\n<tr>\nOperator<br \/>\nTrains during the closure<br \/>\nReplacement buses<br \/>\n<\/tr>\n<tr>\nAvanti West Coast<\/p>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">Amended timetable with no stops at Birmingham New Street<\/td>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">New Street to Wolverhampton; New Street to Birmingham International<\/td>\n<\/tr>\n<tr>\nCrossCountry<\/p>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">Amended or diverted services: Coleshill Parkway\u2013Stansted Airport, Nottingham\u2013Cardiff Central, Edinburgh\u2013Plymouth, Manchester Piccadilly\u2013Bournemouth<\/td>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">New Street to Coleshill Parkway via Water Orton, to Worcestershire Parkway and to Tamworth via Wilnecote; Birmingham International to Coleshill Parkway and to Worcestershire Parkway; Wolverhampton to Worcestershire Parkway<\/td>\n<\/tr>\n<tr>\nLondon Northwestern Railway<\/p>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">London Euston and Northampton services start and end at Birmingham International on Dec. 27\u201328; Crewe and Liverpool Lime Street trains run from Wolverhampton only, less often<\/td>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">Birmingham International to New Street; Sandwell &amp; Dudley to Smethwick Galton Bridge for trains to Snow Hill; Northampton to Rugby via Long Buckby from Dec. 27 to Jan. 1, 2027<\/td>\n<\/tr>\n<tr>\nWest Midlands Railway<\/p>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">Wolverhampton\u2013Rugeley Trent Valley, Shrewsbury\u2013Sandwell &amp; Dudley and Wolverhampton\u2013Sandwell &amp; Dudley at reduced frequency; Worcester Foregate Street, Great Malvern and Hereford trains use Snow Hill; no Cross City trains and none via Kings Heath<\/td>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">Birmingham International to New Street; Sandwell &amp; Dudley to Smethwick Rolfe Street via Galton Bridge; New Street to Walsall, to Lichfield Trent Valley, to Longbridge, Barnt Green, Bromsgrove and Droitwich Spa, and to Kings Norton via Kings Heath; Longbridge and Barnt Green to Redditch<\/td>\n<\/tr>\n<tr>\nTransport for Wales<\/p>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">No trains between Wolverhampton and Birmingham International<\/td>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">None listed; the operator points passengers to other transport between Wolverhampton and Birmingham<\/td>\n<\/tr>\n<tr>\nNotes and sources<\/p>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\" colspan=\"2\">No trains run at New Street on Dec. 25\u201326 in any year, so the closure changes travel on Dec. 24, 27 and 28. Full service returns Dec. 29. Sources: <a href=\"https:\/\/www.networkrailmediacentre.co.uk\/news\/christmas-travel-plan-your-journey-as-birmingham-new-street-prepares-for-major-upgrade\" rel=\"nofollow noopener\" target=\"_blank\">Network Rail travel plan, Oct. 27, 2026<\/a>; <a href=\"https:\/\/www.nationalrail.co.uk\/engineering-works\/birmingham-new-street-24-dec-20261224\/\" rel=\"nofollow noopener\" target=\"_blank\">National Rail engineering works notice<\/a>.<\/td>\n<\/tr>\n<p>Chiltern services, bus tickets and station access<\/p>\n<p><a href=\"https:\/\/www.tfwm.org.uk\/plan-your-journey\/major-roadworks-and-events\/birmingham-new-street-closure\/\" rel=\"nofollow noopener\" target=\"_blank\">Transport for West Midlands<\/a> says Chiltern Railways will keep serving Moor Street and Snow Hill, and that train tickets for local journeys on the Camp Hill and Cross City lines will be accepted on National Express buses.<\/p>\n<p>The station building will stay open throughout, giving access to Grand Central and the city center. The assisted travel lounge and toilets remain available with staff on site, but the Avanti West Coast first class lounge will close. Queuing systems will be used at busy times to help passengers reach replacement buses and onward connections.<\/p>\n<p>How New Street fits into Network Rail\u2019s Christmas 2026 works<\/p>\n<p>Birmingham New Street is one of the key sites in Network Rail\u2019s <a href=\"https:\/\/www.networkrail.co.uk\/our-work\/looking-after-the-railway\/planned-works\/christmas-and-new-year-engineering-works\/\" rel=\"nofollow noopener\" target=\"_blank\">\u00a3152 million program<\/a> of Christmas and New Year 2026 projects, alongside London Paddington and Huddersfield. Several of those jobs keep lines shut for longer. Great Western Railway trains will not reach Paddington until January 4, 2027, the Great Eastern Main Line at Forest Gate will close for 10 days from Christmas Day, and work around Huddersfield will disrupt services until February 1, 2027. <a href=\"https:\/\/www.orr.gov.uk\/search-news\/london-liverpool-street-takes-top-spot-third-year-running\" rel=\"nofollow noopener\" target=\"_blank\">Office of Rail and Road<\/a> figures put New Street as Britain\u2019s busiest station outside London in the year to March 2025, with 36.6 million entries and exits.<\/p>\n<p>Christmas 2026 engineering closures highlighted by Network Rail<\/p>\n<tr>\nLocation<br \/>\nClosure period<br \/>\nMain work<br \/>\n<\/tr>\n<tr>\nBirmingham New Street<\/p>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">No trains from Dec. 24 to the start of service on Dec. 29<\/td>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">First phase of the three-year overhead power supply renewal; track and points at Soho<\/td>\n<\/tr>\n<tr>\nLondon Paddington<\/p>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">Main-line platforms closed from Christmas Day, with the building open for toilets and other facilities; the Elizabeth line keeps serving the low-level platforms except Dec. 25\u201326; Heathrow Express and Elizabeth line trains to Heathrow return Dec. 31; Great Western Railway trains return Jan. 4, 2027<\/td>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">Dolphin Junction near Slough, overhead line equipment and new track in the Thames Valley<\/td>\n<\/tr>\n<tr>\nGreat Eastern Main Line at Forest Gate<\/p>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">10 days from Christmas Day, until the early hours of Jan. 4, 2027<\/td>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">Replacement of worn rails and sleepers<\/td>\n<\/tr>\n<tr>\nRedhill<\/p>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">From Dec. 20 until the early hours of Jan. 4, 2027<\/td>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">New track and points in the station area<\/td>\n<\/tr>\n<tr>\nHuddersfield<\/p>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">Disruption from Christmas Day to the morning of Feb. 1, 2027<\/td>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\">Final phase of the station rebuild under the Transpennine Route Upgrade<\/td>\n<\/tr>\n<tr>\nNotes and source<\/p>\n<td style=\"border: 1px solid #000000; background: #ffffff; padding: 10px 12px; vertical-align: top;\" colspan=\"2\">By these dates, New Street\u2019s closure is the shortest of the five. All are part of Network Rail\u2019s \u00a3152 million Christmas and New Year program. Source: <a href=\"https:\/\/www.networkrail.co.uk\/our-work\/looking-after-the-railway\/planned-works\/christmas-and-new-year-engineering-works\/\" rel=\"nofollow noopener\" target=\"_blank\">Network Rail Christmas and New Year engineering works page<\/a>.<\/td>\n<\/tr>\n","protected":false},"excerpt":{"rendered":"Network Rail has published its travel plan for the Birmingham New Street Christmas closure, with no trains December&hellip;\n","protected":false},"author":2,"featured_media":1279355,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[7820],"tags":[855,748,393,4884,1836,215005,16,15],"class_list":["post-1279354","post","type-post","status-publish","format-standard","has-post-thumbnail","category-birmingham","tag-birmingham","tag-britain","tag-england","tag-great-britain","tag-network-rail","tag-rail-transport-in-the-uk","tag-uk","tag-united-kingdom"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@uk\/117518304391249653","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/posts\/1279354","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/comments?post=1279354"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/posts\/1279354\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/media\/1279355"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/media?parent=1279354"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/categories?post=1279354"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/tags?post=1279354"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}