{"id":404924,"date":"2025-09-07T09:46:17","date_gmt":"2025-09-07T09:46:17","guid":{"rendered":"https:\/\/www.europesays.com\/uk\/404924\/"},"modified":"2025-09-07T09:46:17","modified_gmt":"2025-09-07T09:46:17","slug":"glasgows-m8-set-for-nine-months-of-roadworks","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/uk\/404924\/","title":{"rendered":"Glasgow&#8217;s M8 set for nine months of roadworks"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" alt=\"Cars streaming along a stretch of the M8 in Glasgow\" src=\"https:\/\/www.europesays.com\/uk\/wp-content\/uploads\/2025\/09\/e90a8200-8bca-11f0-937d-cfdcf994900e.jpg\"  width=\"1024\" height=\"576\" class=\"ssrcss-11yxrdo-Image edrdn950\"\/>Image source, Getty ImagesImage caption, <\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">The M8 is used by about 150,000 people a day<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\"><b class=\"ssrcss-1xjjfut-BoldText e5tfeyi3\">Drivers using Scotland&#8217;s busiest road are set for nine months of disruption due to roadworks.<\/b><\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Work on Junction 26 on <a href=\"https:\/\/www.bbc.co.uk\/news\/articles\/c1jp7wlj983o\" class=\"ssrcss-f6h2dj-InlineLink e1kn3p7n0\" target=\"_blank\" rel=\"noopener\">the M8<\/a> &#8211; spanning both the eastbound and westbound carriageways &#8211; will begin on Monday.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">With the exception of a brief break for the festive period, disruption on the road, which is used by 150,000 people a day, is set to run until 10 May next year.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">The \u00a310m programme will focus around upgrading and refurbishing four bridges around Junction 26, which have become riddled with potholes. <\/p>\n<p>What roadworks are taking place on the M8?<\/p>\n<p><img decoding=\"async\" alt=\"A busy motorway at night, with the roads packed with cars and vans\" loading=\"lazy\" src=\"https:\/\/www.europesays.com\/uk\/wp-content\/uploads\/2025\/09\/d19a9360-8a5f-11f0-8d38-636775327ed2.jpg\"  width=\"3840\" height=\"2160.0980792807522\" class=\"ssrcss-11yxrdo-Image edrdn950\"\/>Image source, Getty ImagesImage caption, <\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">The work will take about nine months to complete<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Four bridges around Junction 26 of the M8 were built back in 1968 and carry the M8 over both local roads and the railway. <\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">As time has passed, wear and tear on the surfaces has grown considerably, particularly with potholes.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">After a constant run of emergency repairs needing to be carried out on the bridges, a full resurfacing, with repairs, of the bridges is now required. <\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">The affected bridges are Hillington Interchange East, Hillington Interchange West, Hillington Rail and Hillington Slip.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">As well as the surfaces, the existing edge parapets and central reservation barriers are in poor condition and not compliant with current standards.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">They will be either strengthened or replaced entirely. <\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Two lanes westbound and eastbound will be maintained throughout the works.<\/p>\n<p>What does the first phase of the M8 roadworks involve?<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">The work will be carried out over five phases, running from 8 September until 10 May.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">The first phase will run until 1 October, with a contraflow system established on the M8&#8217;s mainline carriageway at Junction 26 &#8211; meaning traffic will go in the opposite direction to how it should normally flow. <\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Lane Two and Lane Three of the eastbound carriageway and narrow running lanes will be closed during this phase.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">A total closure of the eastbound on-slip road will be implemented as well, and traffic will be diverted as a result.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">In daytime hours, drivers north of the Hillington Interchange for vehicles in the Renfrew and Braehead area should follow the interchange to King&#8217;s Inch Road and Old Govan Road, before joining the M8 eastbound at the Junction 25A (Braehead) on-slip road.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">After 19:00 drivers should join the M8 eastbound at the Junction 24 (Helen Street Interchange) on-slip road.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Traffic wishing to use Junction 26 from south of the interchange will be directed to join the M8 eastbound via Junction 24 on-slip road.<\/p>\n<p>What is the schedule for the M8 roadworks?<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Phase 2 will begin 2 October and run until 14 December. It will result in lanes 1 and 2 being closed going eastbound, along with the eastbound on-slip road remaining closed.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">The third phase then begins 15 December, and will see barrier upgrades being implemented.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Lane 3 will be closed both eastwards and westwards while this goes on. It will last until 8 February, with a break for the Christmas period lasting from 18 December until 5 January. <\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Phase 4 runs from 9 February until 2 March, and will feature Lanes 2 and 3 being closed going westbound, with the westbound offslip will be closed at night and for a single weekend.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Ominously for drivers, road maintenance company Amey notes that &#8220;significant delays&#8221; are anticipated at this time.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Lastly, the final phase will be from 3 March next year until 10 May.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">The Junction 26 westbound off-slip will remain closed at night, with contraflow in westbound lanes 1 and 2.<\/p>\n<p>Will speed restrictions form part of the M8 roadworks?<\/p>\n<p><img decoding=\"async\" alt=\"An average speed camera, coloured yellow, and sitting on a traffic pole\" loading=\"lazy\" src=\"https:\/\/www.europesays.com\/uk\/wp-content\/uploads\/2025\/09\/3228bef0-8a60-11f0-8d38-636775327ed2.jpg\"  width=\"3840\" height=\"2160\" class=\"ssrcss-11yxrdo-Image edrdn950\"\/>Image source, Getty ImagesImage caption, <\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Average speed cameras will be in operation throughout the works<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Yes. 40mph speed restrictions will be implemented on both westbound and eastbound lanes.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Amey says the move is needed to ensure the safety of both workers on the site, and the public in general.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">The first phase of work &#8211; starting Monday &#8211; is initially focused around  preparing to install temporary average speed cameras.  <\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">The works then progresses over the following months to bridge waterproofing, concrete repairs, resurfacing, expansion joint replacements, edge beam strengthening, and barrier upgrades.<\/p>\n<p>How much extra time will the M8 roadworks add to drivers journeys?<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Delays are expected, but Amey appears to be optimistic for the first phase of work.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Using traffic modelling &#8211; where traffic patterns are simulated &#8211; the maximum delays westbound and eastbound are expected to be up to six minutes off-peak and up to 15 minutes during peak times.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">However, phases 4 and 5, where the majority of work will be on the westbound lanes, are expected to bring significant delays.<\/p>\n<p>What benefits should the M8 improvements bring?<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Amey says the work is essential to ensure the motorway remains safe and reliable.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">&#8220;Proactive maintenance now helps us avoid the risk of deterioration that could lead to more disruptive closures in future,&#8221; a spokesman said.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">&#8220;By carrying out these works now, we are protecting a vital part of Scotland&#8217;s trunk road network.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">&#8220;The investment will reduce the risk of unplanned closures and ensure that the M8 can continue to support communities, road users and businesses across the region.&#8221;<\/p>\n<p>What other work is going on with the M8?<\/p>\n<p><img decoding=\"async\" alt=\"Roadworks taking place on a deserted stretch of motorway at night. \" loading=\"lazy\" src=\"https:\/\/www.europesays.com\/uk\/wp-content\/uploads\/2025\/09\/6580f8d0-8a60-11f0-9cf6-cbf3e73ce2b9.jpg\"  width=\"976\" height=\"549\" class=\"ssrcss-11yxrdo-Image edrdn950\"\/>Image source, Transport ScotlandImage caption, <\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Temporary repairs to the Woodside Viaduct, near Charing Cross, have been ongoing for four years<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">The upcoming improvements are not the only work taking place on the M8.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Temporary repairs to the Woodside Viaduct, near Charing Cross, have already been going on for four years, and <a href=\"https:\/\/www.bbc.co.uk\/news\/articles\/ckgjl1mlr30o\" class=\"ssrcss-f6h2dj-InlineLink e1kn3p7n0\" target=\"_blank\" rel=\"noopener\">it was announced last month<\/a> that the work will not conclude until the second half of 2027 &#8211; considerably later than the original planned date of late 2023. <\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Maintenance work on footbridges at Kirkwood Street and Cornwall Street is set to last until December this year.<\/p>\n<p class=\"ssrcss-1q0x1qg-Paragraph e1jhz7w10\">Resurfacing work around Charing Cross will continue throughout September, while masonry repairs at Junction 15 are expected to finish in the coming week. <\/p>\n","protected":false},"excerpt":{"rendered":"Image source, Getty ImagesImage caption, The M8 is used by about 150,000 people a day Drivers using Scotland&#8217;s&hellip;\n","protected":false},"author":2,"featured_media":404925,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7826],"tags":[748,918,4884,712,16,15],"class_list":{"0":"post-404924","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-glasgow","8":"tag-britain","9":"tag-glasgow","10":"tag-great-britain","11":"tag-scotland","12":"tag-uk","13":"tag-united-kingdom"},"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@uk\/115162381686593473","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/posts\/404924","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/comments?post=404924"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/posts\/404924\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/media\/404925"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/media?parent=404924"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/categories?post=404924"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/uk\/wp-json\/wp\/v2\/tags?post=404924"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}