A major Highland Park construction project is set to begin Tuesday morning, closing portions of Wycliffe Avenue for two years as the town works to address local concerns. 

The full temporary road closure will affect Wycliffe Avenue between Abbott and Oak Lawn avenues. Other affected cross streets are Lakeside Drive, St. Johns Drive and Turtle Creek Boulevard; however, the town said not all areas will be affected simultaneously. 

Sections of Wycliffe Avenue between St. Johns and Lakeside drives act as a dam, but it is currently incapable of carrying storm runoff. Residents discussed this issue in a 2024 town hall. The purpose of the Wycliffe Avenue Reconstruction Project is to update the road to include a weir — a low-head dam that acts as a small barrier. 

According to the town, the Texas Commission on Environmental Quality classified the dam and nearby infrastructure as “high hazard,” meaning it could result in the loss of human life in the event of major flooding. The reconstruction project is “engineered to withstand a 100-year storm event” and aims to reclassify the area as “low hazard.” 

Work on the project includes upgrading the water drainage system, replacing underground utilities, and reconstructing roads to create safer routes for local traffic. The project also includes upgrades to pedestrian paths and aesthetic improvements throughout the neighborhood. Wycliffe Avenue will be reduced from three lanes to two, and a dedicated left-turn lane will be added across the bridge. 

Over the next two years, access to the affected streets will be limited to local residents. Construction will take place less than a mile from the intersection of Fitzhugh Avenue and U.S. Highway 75, and is expected to increase traffic. Motorists, cyclists and pedestrians are urged to plan alternate routes and allow for additional travel time, especially during peak periods. 

The Wycliffe Avenue Reconstruction Project is one of “the most significant infrastructure initiatives in Highland Park history,” said Lance Koppa, community and media relations manager for the town.

The project is expected to cost about $22 million, with funding coming from several state and federal sources, including the Texas Department of Transportation and local tax dollars.