KUUJJUAQ — Near the entrance to the largest municipal dump in Nunavik sits a rusting yellow sewage truck with a cheery sign stuck to its sludge tank.

“Welcome to the Canadian Tire of Kuujjuaq,” it reads.

With few places to buy supplies, locals line up at the dump as early as 5 a.m. to search for discarded construction materials to fix homes and hunting shacks.

“I know a guy who found enough siding to do his entire cottage,” said Lupin Daignault, director of the Nunavik Housing Bureau.

Because the 14 villages in Quebec’s northern region are only accessible by air or sea, construction materials are shipped in by boat. With nowhere for firms to return excess materials, they end up in the dump, a trove of treasures amid the dented washing machines and smouldering trash.

A yellow truck with a hand-drawn sign on it saying Welcome to the Canadian Tire of Kuujjuaq.The village dump has been dubbed “The Canadian Tire of Kuujjuaq” by local residents who use discarded construction supplies for renovation work. Dave Sidaway / Montreal Gazette

The site is emblematic of the long-running housing crisis in Quebec’s North, where materials and labour are so expensive, building costs are as much as four times what they are in Montreal, 1,400 kilometres to the south.

A 2025 report by the Raymond Chabot Grant Thornton consulting firm found that “despite the recent construction of social housing, the housing situation in Nunavik remains critical.”

One in five families reported living in overcrowded conditions and were on a waiting list for a new home. One-quarter said they had five people or more living in units with only three bedrooms.

“It’s couch surfing. It’s 12 people living in a four-and-a-half. It’s huge stress for the people living there,” Daignault said.

Much of the issue stems from the region’s remoteness. Construction materials, crews, and related needs like food have to be shipped or flown in. The number of cargo ships that arrive during the short building season from June to October is limited, reducing the number of homes that can be built.

An aerial view of village of Kuujjuaq with houses in the foreground and water in the distance.Housing costs in northern villages like Kuujjuaq can be as high as four times the cost of building in Montreal because construction materials have to be brought in by boat during the short building season. Dave Sidaway / Montreal Gazette

More than 600 people are on a waiting list with the Nunavik Housing Bureau to find accommodation. Many are young adults ready to leave overcrowded family homes.

“Housing is a basic need, and when it’s not fulfilled, it increases all the trauma,” Daignault said. “And there’s a lot of trauma in northern communities.”

The shortage also excludes many young people from living in their community. Noah Pépin-Papigatuk’s home village is Salluit, on Nunavik’s north coast. The 27-year-old makes good money working at the Raglan nickel mine 100 kilometres away, but he would be on a waiting list for years before being granted a home under Nunavik’s social housing system. Many young adults live in family homes filled far beyond capacity.

“I think alcoholism and drug addiction is something that happens in part because of the lack of privacy,” Pépin-Papigatuk told The Gazette. “If you can’t have any private moments, for sure you’re going to go out and do mischief with your friends.

“People up north are having a lot of mental-health challenges as a result of the housing crisis.”

The Gazette travelled to Kuujjuaq and Tasiujaq this summer to see the effects of the housing shortage in the North, a region that occupies one-third of Quebec’s geography and whose population of 14,000 is 90 per cent Inuit.

Despite large government subsidies to renovate homes and build more than 60 new ones each year, “the housing crisis is not getting better,” Daignault said. High costs, long waiting lists, a youthful population and a lack of smaller units are all contributing to the problem.

On top of those issues, a recent audit of the effects of global warming on existing housing indicate the shortage could get much worse in the coming years.

Housing shortage affects residents, teachers, health staff

Two men standing on scaffolding working on building a new residence in Kuujjuaq.A new building under construction in Kuujjuaq earlier this year. Hundreds of people are on a waiting list for new housing in the Nunavik region, according to the local housing bureau. Dave Sidaway / Montreal Gazette

The housing issue extends beyond families. Most teachers who work in the elementary and high schools are from the south and need accommodation, but there are no apartments to rent. Regional school board Kativik Ilisarniliriniq manages 400 housing units for staff not from Nunavik. In August, it estimated it needed 150 more units, and could not hire sufficient teachers because of the lack.

The shortage impacts children’s ability to learn in other ways.

“When all the rooms in a house are shared by several residents belonging to multiple generations, it’s difficult, if not impossible, to isolate oneself to study,” board director general Harriet Keleutak told The Gazette. “If one of the residents of the house goes through a difficult time or faces health problems, all residents are affected.”

The board estimates filling its housing needs across Nunavik would cost $292 million.

Health and social services organizations also lack housing, limiting the number of health professionals coming from the south. Even the Nunavik Housing Bureau, responsible for managing and maintaining the social housing that accounts for more than 90 per cent of lodging in the region, has several positions it can’t fill because it has no homes for employees.

There are no miracle solutions, but there are changes Daignault thinks could help. During a tour of the housing options in Kuujjuaq, he took us to a spacious two-storey, four-bedroom home with gleaming kitchen appliances that’s part of the social housing network. It took more than a year to build, at a cost of roughly $2 million — four times the price in southern Quebec.

“We could put a four- or even six-person multiplex in the same footprint of this home, with one-bedroom units, that could house several young people,” Daignault said. “No one is building that in Nunavik.”

When surveyed, most families say they want multi-bedroom homes, so local politicians push for those, Daignault said. But Nunavik has a relatively young population — the average age is 28, compared with 43 for Quebec as a whole — which means there’s a growing number in need of single-bedroom housing.

“To combat the housing crisis, we need a vision,” he said. “Politicians have to make unpopular choices, as opposed to just doing what the people say they want.

“Because at this rate we’ll never win.”

Makivvik, the legal and political organization for Nunavik’s Inuit, oversees housing development and dictates the kinds of homes that are built. It did not respond to repeated requests for interviews.

Prefabricated homes a possible solution

A man wearing a cap, glasses and a winter coat is smiling at the camera.Willie Gadbois is the owner of Nunavik Building Inc. The company builds modular homes in Napierville, south of Montreal, and ships them to communities in northern Quebec. Photo courtesy of Nunavik Building Inc.

Another alternative is prefabricated homes, like those made by local developer Willie Gadbois. His Nunavik Building Inc. company ships more than 40 modular homes a year to the North. The compact, insulated homes are delivered complete with kitchen appliances, furnishings, a television and even cutlery in the drawers. All are pre-built in a factory in Napierville, south of Montreal.

Far cheaper than houses built on site, prices are still high by southern standards.

With few trained local workers, Gadbois has to fly in most of his staff. The return flight from Montreal to Kuujjuaq is $4,000. It costs $280 per worker per night to lodge employees in staff housing.

As a result, a one-bedroom, 640-square-foot modular unit sells for $550,000. A 1,100-square-foot house goes for $850,000.

Most of Gadbois’s homes are commissioned by local government bureaus and used by workers like teachers and health-care staff. He would like to see more inhabited by young Inuit.

“There’s a lot of young people trying to start their families and it causes a lot of overcrowding and a lot of problems,” he said.

Gadbois is looking into creating his own training program to teach locals the skills needed to install homes.

Millions of dollars needed to adapt housing to global warming

A one-story building with brown siding built on steel H-beams in the village of Kuujjuaq.These prefabricated homes were built in Napierville and transported by ship to Kuujjuaq. They were built on metal beams to prevent damage to the structure from the ground shifting. Dave Sidaway / Montreal Gazette

In a cleared lot near the centre of Kuujjuaq, more than a dozen modular homes inhabited by nurses, teachers and construction workers are lined up on gravel pads. A house painter from Laval named Valérie, who has come north to work, shows us her temporary home, modular units affixed together like a giant Lego set.

“It’s nice, it’s clean, and it has everything,” she said, pointing out the full bathroom and a slender bedroom.

Another crucial element: The homes are supported underneath by steel H-beams that run the length of the structure, so the building will tilt as one if the ground beneath falls or heaves, as opposed to one section breaking off.

That’s the fate of many northern structures supported by steel posts or placed on the ground. When the foundation shifts, windows shatter, water lines burst and walls and roofs rupture, rendering the building uninhabitable.

A survey of the roughly 4,000 homes in Nunavik is forecasting hundreds of residences in almost every village could suffer similar damages in the coming years due to global warming, which is melting the permafrost or drying the clay soil supporting them, Daignault said. Early estimates predict it will cost hundreds of millions to repair or move them. The study’s results are expected in 2027.

“It will be a massive project,” Daignault said.

So in addition to a housing shortage that’s already at crisis stage, Nunavik is faced with the reality many of the homes it already has may soon become unlivable.

Profile picture of René Bruemmer

René Bruemmer has been a reporter and features writer at the Gazette since 2001. A Montreal native, he covers mainly municipal and social issues as well as defence.