by Scott Nishimura, Fort Worth Report
May 30, 2026

Editor’s note: Transcript provided by CoverGov.

A rebuild of a 1.4-mile stretch of West Pipeline Road between Harrison Trail and Brown Trail is coming.

The Hurst City Council on May 26 approved a $7 million contract for reconstruction of the roadway. The project includes utilities work, installation of new street lighting, and demolition and rebuilding of a bridge. The work is expected to take close to two years.

The council awarded the contract to SYB Construction, based in Venus, Texas. Five other bids ranged from about $8 million to about $7.3 million. 

“We’re also making sure that we are very careful with the existing gas lines that are relocated by Atmos,” said Hurst public works director Robert Sauceda, adding that the majority of the time is needed for work on the bridge.

“The contractor has to be working with traffic, with businesses, and that existing gas line, so we have to be very careful,” he said.

A map and construction bids list for the project is available on the city of Hurst website.

Rickel Park repairs

Council members also ratified city manager Clay Caruthers’ emergency purchases, not to exceed $455,000, for erosion repairs at Rickel Park.

Sauceda said design work for the repairs was done in-house to save money.

“This is part of our priority-based budgeting in the city,” he added.

The repairs are necessary to “protect the drainage channel area from future erosion,” the Parks & Recreation Department said on its Facebook page.

To learn more about how the transcript that informed this report was created, visit covergov.com.

Eric Zarate is a freelance journalist. If you believe anything in this account is inaccurate, please email us at news@fortworthreport.org with “Correction Request” in the subject line.

This <a target=”_blank” href=”https://fortworthreport.org/2026/05/30/hurst-city-council-addresses-west-pipeline-road-7m-project-rickel-park/”>article</a> first appeared on <a target=”_blank” href=”https://fortworthreport.org”>Fort Worth Report</a> and is republished here under a <a target=”_blank” href=”https://creativecommons.org/licenses/by-nd/4.0/”>Creative Commons Attribution-NoDerivatives 4.0 International License</a>.<img src=”https://i0.wp.com/fortworthreport.org/wp-content/uploads/2021/04/cropped-favicon.png?resize=150%2C150&amp;ssl=1″ style=”width:1em;height:1em;margin-left:10px;”>

<img id=”republication-tracker-tool-source” src=”https://fortworthreport.org/?republication-pixel=true&post=579034&amp;ga4=2820184429″ style=”width:1px;height:1px;”><script> PARSELY = { autotrack: false, onload: function() { PARSELY.beacon.trackPageView({ url: “https://fortworthreport.org/2026/05/30/hurst-city-council-addresses-west-pipeline-road-7m-project-rickel-park/”, urlref: window.location.href }); } } </script> <script id=”parsely-cfg” src=”//cdn.parsely.com/keys/fortworthreport.org/p.js”></script>