{"id":1063544,"date":"2026-09-14T20:44:17","date_gmt":"2026-09-14T20:44:17","guid":{"rendered":"https:\/\/www.europesays.com\/us\/1063544\/"},"modified":"2026-09-14T20:44:17","modified_gmt":"2026-09-14T20:44:17","slug":"txdots-1-7-billion-635-east-project-completed-in-dallas-county","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/us\/1063544\/","title":{"rendered":"TxDOT\u2019s $1.7 billion 635 East Project completed in Dallas County"},"content":{"rendered":"<p>City representatives from Dallas, Garland and Mesquite, as well as regional transportation officials, gathered in the managed lanes of Interstate 635 in Garland Monday morning to celebrate the completion of the six-year long and $1.7 billion 635 East Project at a ribbon cutting ceremony.\u00a0\u00a0<\/p>\n<p>Part of the Lyndon B. Johnson Freeway, the project reconstructed and widened 11 miles of I-635, from U.S. Highway 75 to Interstate 30 in Dallas County. An additional general purpose lane was added in each direction, and the managed lanes were completely rebuilt.\u00a0<\/p>\n<p>This also marks the end of a three-phase, multi-decade project. According to Tony\u00a0Hartzel, public information officer for TxDOT\u2019s Dallas district, phase one \u2013 which spanned from U.S. Highway 80 to I-30 in Mesquite \u2013 was completed in the early 2000s. Phase two, which was construction on the LBJ TEXpress lanes, ran from 2009 to 2015.<\/p>\n<p>\u201cWith the completion of this final segment, the entire LBJ corridor is ready for a renewal,\u201d said Mesquite Mayor Daniel Aleman Jr. \u201cThe potential for expansion in eastern Dallas County will have a definite impact in all of our communities.\u201d<\/p>\n<p>Dallas City Council member Kathy Stewart frequently drove I-635, saw how bad traffic had gotten and knew how much worse it could get. She began working with other North Texas residents passionate and concerned about the interstate.\u00a0<\/p>\n<p>Stewart advocated for improvements on I-635 and helped secure necessary funding. For years, she said she spoke with local and regional officials to help accelerate the construction process prior to being elected in 2023.<\/p>\n<p>Now, Stewart represents Dallas 10th District, the same district the interstate runs through.\u00a0<\/p>\n<p>\u201cIt\u2019s been a long time coming, but we finally did it,\u201d Stewart said.\u00a0<\/p>\n<p>The interstate, which has a total of 12 lanes, carries more than 230,000 motorists daily, according to the Texas Department of Transportation.\u00a0<\/p>\n<p>The project is part of the bigger statewide Texas Clear Lanes initiative to help improve mobility and reduce congestion throughout the five major metropolitan areas \u2014 Austin, Dallas, Fort Worth, Houston and San Antonio.\u00a0<\/p>\n<p>Although this project is finished, work on the interstate continues. Last February, construction began on the $540 million U.S. Highway 80 at I-635 interchange project in Mesquite. According to TxDOT, construction is currently 41% complete and expected to finish by late 2029.<\/p>\n","protected":false},"excerpt":{"rendered":"City representatives from Dallas, Garland and Mesquite, as well as regional transportation officials, gathered in the managed lanes&hellip;\n","protected":false},"author":3,"featured_media":1063545,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[5135],"tags":[5229,1596,324474,6228,358,341388,324473,290169,326777,353834,522,3187,8320,67,586,132,5230,68,2969],"class_list":["post-1063544","post","type-post","status-publish","format-standard","has-post-thumbnail","category-dallas","tag-america","tag-dallas","tag-news-transportation","tag-service","tag-texas","tag-tp-mesquite","tag-tp-transportation","tag-tp-dallas","tag-tp-dallas-county","tag-tp-garland","tag-transportation","tag-tx","tag-txdot","tag-united-states","tag-united-states-of-america","tag-unitedstates","tag-unitedstatesofamerica","tag-us","tag-usa"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@us\/117271348478812606","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/posts\/1063544","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/comments?post=1063544"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/posts\/1063544\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/media\/1063545"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/media?parent=1063544"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/categories?post=1063544"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/tags?post=1063544"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}