{"id":1108480,"date":"2026-10-08T14:02:14","date_gmt":"2026-10-08T14:02:14","guid":{"rendered":"https:\/\/www.europesays.com\/us\/1108480\/"},"modified":"2026-10-08T14:02:14","modified_gmt":"2026-10-08T14:02:14","slug":"construction-begins-on-11-mile-stretch-of-i-10-between-phoenix-casa-grande","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/us\/1108480\/","title":{"rendered":"Construction begins on 11-mile stretch of I-10 between Phoenix, Casa Grande"},"content":{"rendered":"<p class=\"text | article-text text-start\"><b>PHOENIX (AZFamily)<\/b> \u2014 Crews have begun construction on an 11-mile stretch of Interstate 10 between Loop 202 and the Gila River as part of a project to expand the corridor between Phoenix and Casa Grande.<\/p>\n<p class=\"text | article-text text-start\">The work is the third of four segments in the 26-mile <a href=\"https:\/\/i10wildhorsepasscorridor.com\/\" target=\"_blank\" rel=\"nofollow noopener\" title=\"https:\/\/i10wildhorsepasscorridor.com\/\">I-10 Wild Horse Pass Corridor Project<\/a>. Crews will add a third general-purpose lane in each direction and a high-occupancy vehicle (HOV) lane between Loop 202 and Riggs Road.<\/p>\n<p class=\"text | article-text text-start\">The project also includes rebuilding interchanges at Wild Horse Pass Boulevard, Riggs Road and Queen Creek Road\/State Route 347 and building a new interchange at Koli Road. Crews will install overhead message boards, freeway cameras and wrong-way detection systems.<\/p>\n<p class=\"text | article-text text-start\">The first segment began in May 2024, replacing the I-10 bridges over the Gila River. Finishing work on the bridges is scheduled for next month.<\/p>\n<p class=\"text | article-text text-start\">Construction on the second segment began in January 2026. It runs 10 miles from Gas Line Road to just north of Casa Grande, near the Pinal Avenue\/State Route 387 interchange. <\/p>\n<p class=\"text | article-text text-start\">Work includes adding a third lane in each direction, rebuilding the Pinal Avenue interchange and building a new interchange at Seed Farm Road. Crews are also widening the Gas Line Road bridge and removing the Dirk Lay Road bridge.<\/p>\n<p class=\"text | article-text text-start\">The project is intended to reduce congestion and travel times between the Phoenix and Casa Grande areas. All four segments are expected to be complete by late 2029.<\/p>\n<p class=\"text | article-text text-start\">See a spelling or grammatical error in our story? <a href=\"https:\/\/www.azfamily.com\/page\/send-us-your-feedback\/\" rel=\"nofollow noopener\" target=\"_blank\">Please click here to report it<\/a>.<\/p>\n<p class=\"text | article-text text-start\">Do you have a photo or video of a breaking news story? Send <a href=\"https:\/\/www.azfamily.com\/community\/user-content\" rel=\"nofollow noopener\" target=\"_blank\">it to us here<\/a> with a brief description.<\/p>\n<p>Copyright 2026 KTVK\/KPHO. All rights reserved.<\/p>\n","protected":false},"excerpt":{"rendered":"PHOENIX (AZFamily) \u2014 Crews have begun construction on an 11-mile stretch of Interstate 10 between Loop 202 and&hellip;\n","protected":false},"author":3,"featured_media":1108481,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[5131],"tags":[15941,5229,5643,32560,1587,7182,443050,443048,50,1589,7183,314,67,586,132,5230,68,2969,443049,383519],"class_list":["post-1108480","post","type-post","status-publish","format-standard","has-post-thumbnail","category-phoenix","tag-adot","tag-america","tag-arizona","tag-arizona-department-of-transportation","tag-az","tag-azfamily","tag-i10-expanded-casa-grande","tag-interstate-10-construction-project","tag-news","tag-phoenix","tag-phoenix-news","tag-traffic","tag-united-states","tag-united-states-of-america","tag-unitedstates","tag-unitedstatesofamerica","tag-us","tag-usa","tag-wild-horse-pass-construction","tag-wild-horse-pass-corridor-project"],"share_on_mastodon":{"url":"","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/posts\/1108480","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/comments?post=1108480"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/posts\/1108480\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/media\/1108481"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/media?parent=1108480"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/categories?post=1108480"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/tags?post=1108480"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}