{"id":465611,"date":"2025-12-23T01:59:16","date_gmt":"2025-12-23T01:59:16","guid":{"rendered":"https:\/\/www.europesays.com\/us\/465611\/"},"modified":"2025-12-23T01:59:16","modified_gmt":"2025-12-23T01:59:16","slug":"chicago-bridge-closures-more-delays-future-closures-for-state-street-bridge-other-chicago-river-bridges-in-need-of-repair","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/us\/465611\/","title":{"rendered":"Chicago bridge closures: More delays, future closures for State Street bridge, other Chicago River bridges in need of repair"},"content":{"rendered":"<p class=\"EkqkG IGXmU nlgHS yuUao MvWXB TjIXL aGjvy ebVHC \">CHICAGO (WLS) &#8212; As holiday commuters continue to snarl up traffic around the downtown Loop, the ABC7 I-Team has learned a Chicago River bridge that was closed for repairs most of this year is not reopening anytime soon.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">This is the second time that the reopening of the State Street bridge downtown has been delayed.<\/p>\n<p><a class=\"zZygg UbGlr iFzkS qdXbA WCDhQ DbOXS tqUtK GpWVU iJYzE \" data-testid=\"prism-linkbase\" href=\"https:\/\/abc7chicago.com\/watch\/live\/11064984\/\" rel=\"nofollow noopener\" target=\"_blank\">ABC7 Chicago is now streaming 24\/7. Click here to watch<\/a><\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">Looking ahead to 2026 and the years to follow, the I-Team has learned more bridges could be closed as city engineers race to repair these century-old iconic city features.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">While moveable bridges over the Chicago River are a city hallmark, their closures are congesting rush-hour traffic on a daily basis.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">During rush-hour traffic around 300 N. Canal Street, some commuters may have felt palpable fear. The I-Team&#8217;s cameras captured backed-up drivers stuck on Metra railroad tracks, trying to pull out and away from danger as the railroad gate arms came down.<\/p>\n<p><a class=\"zZygg UbGlr iFzkS qdXbA hsDdd DbOXS oklLN GpWVU iJYzE \" data-testid=\"prism-linkbase\"><img decoding=\"async\" alt=\"Cars caught on Metra railroad tracks at 333 N. Canal Street. Traffic is backed up in the area due to the closure of the Lake Street river bridge.\" class=\"hsDdd NDJZt sJeUN IJwXl vBqtr KrDt itslR WAUrb hakZw HlUVI \" data-testid=\"prism-image\" draggable=\"false\" src=\"https:\/\/www.europesays.com\/us\/wp-content\/uploads\/2025\/12\/18307832_122225-wls-iteam-cars-stuck-img.png\"\/><\/a><\/p>\n<p>Cars caught on Metra railroad tracks at 333 N. Canal Street. Traffic is backed up in the area due to the closure of the Lake Street river bridge.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">Driver after driver, these cars are backed up after the Lake Street bridge was closed earlier this year for repairs. It&#8217;s not slated to reopen until January 2028, <a class=\"zZygg UbGlr iFzkS qdXbA WCDhQ DbOXS tqUtK GpWVU iJYzE \" data-testid=\"prism-linkbase\" href=\"https:\/\/www.chicago.gov\/city\/en\/depts\/cdot\/supp_info\/lake-street-bascule-bridge-rehabilitation.html\" target=\"_blank\" rel=\"nofollow noopener\">according to the Chicago Department of Transportation<\/a> (CDOT).<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">Speaking with the I-Team this fall, CDOT&#8217;s Chief Bridge Engineer Arsalan Khan explained these types of river bridges require more extensive work than the common bridge.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">&#8220;These are such complex structures that, you know, we can only do so much modernization,&#8221; Khan explained. &#8220;And these [bridges] have to move, so we have to be cognizant of how much work we do on that&#8230; It&#8217;s a very labor-intensive process.&#8221;<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">After the surprise closure of the State Street bridge for &#8220;emergency repairs&#8221; in April, the reopening date has been pushed back twice.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">Originally scheduled to reopen mid-November, it was first pushed to January 2026 for additional steel repairs.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">Now, due to &#8220;weather-related delays,&#8221; CDOT officials tell the I-Team the State Street bridge reopening has been pushed back again. No reopening date has been set yet.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">In addition to four bridges currently closed for repairs (State Street, Lake Street, Chicago-Halsted, and Cortland), the I-Team has learned more will be closed in the coming years.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">The N. LaSalle Street bridge in the downtown loop is slated for &#8220;major rehabilitation as soon as 2026,&#8221; CDOT officials confirmed.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">Also, the Michigan and Grand Avenue river bridges are also needing &#8220;major&#8221; work and will require closure, possibly starting in the next two years.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">The closures and ripple effect they are having on traffic has upset some aldermen, including 42nd Ward Ald. Brendan Reilly.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">&#8220;There&#8217;s no dispute that these are old bridges that need to be repaired,&#8221; Reilly told the I-Team. &#8220;The issue here is the lack of coordination.&#8221;<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">&#8220;If you&#8217;re familiar with traffic patterns downtown, especially during rush hour, you understand that incredible amount of traffic volume is going east and west, and when you shut off all of those routes at the same time&#8230; that is going to have a significant impact on people&#8217;s ability to get home,&#8221; Reilly said.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \"><a class=\"zZygg UbGlr iFzkS qdXbA WCDhQ DbOXS tqUtK GpWVU iJYzE \" data-testid=\"prism-linkbase\" href=\"https:\/\/abc7chicago.com\/post\/chicagos-race-repair-iconic-downtown-river-bridges-leading-last-minute-closures-traffic-headaches\/18123549\/\" rel=\"nofollow noopener\" target=\"_blank\">As the I-Team reported in November<\/a>, aldermen and commuters have been vocal with the frustration of so many closures all at the same time. A review of federal data from the National Bridge Inventory shows most of the city&#8217;s bridges that are in need of high-priority repairs have been listed in &#8220;poor condition&#8221; since 2016.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">&#8220;What we can&#8217;t do is layer future bridge closures on top of the ones that already are [in place],&#8221; Reilly said. &#8220;That will literally turn the central business district of Chicago into an island onto itself.&#8221;<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">But because of the age and complexity of these iconic structures, CDOT says sometimes even planned closures are unpredictable.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">&#8220;If something gets critical, we will close it,&#8221; Khan told the I-Team in November. &#8220;Our first instinct is try to figure out like, how can we still maintain traffic on it&#8230; If there was imminent danger, we would close the bridge.&#8221;<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">While the CDOT has told the I-Team there is no master schedule for bridge repairs, the I-Team inquired about 10 river bridges that are currently listed as needing &#8220;high priority&#8221; repairs or replacement.<\/p>\n<p class=\"EkqkG IGXmU nlgHS yuUao lqtkC TjIXL aGjvy \">Here&#8217;s what city officials told us about those bridges:<br class=\" \"\/><\/p>\n<ul class=\"sfxjZ dAmzA UoVV WtEci dSKvB seFhp wtgAa XoCUF \" data-testid=\"prism-list\">\n<li class=\"mmrhV WeAzC lZur foTEL SpgmX cnYss qArv hxIMs isuUo hCkek nYZyJ xXFZR luHJ DuCgd Veett \" data-testid=\"prism-list-item\"\/>\n<li class=\"mmrhV WeAzC lZur foTEL SpgmX cnYss qArv hxIMs isuUo hCkek nYZyJ xXFZR luHJ DuCgd Veett \" data-testid=\"prism-list-item\"><a class=\"zZygg UbGlr iFzkS qdXbA WCDhQ DbOXS tqUtK GpWVU iJYzE \" data-testid=\"prism-linkbase\" href=\"https:\/\/www.google.com\/maps\/place\/829+W+Division+St,+Chicago,+IL+60642\/@41.9036122,-87.6500579,1678m\/data=!3m2!1e3!4b1!4m5!3m4!1s0x880fd32fb0e42b43:0xc08d803363dcf589!8m2!3d41.9036122!4d-87.6500579?entry=ttu&amp;g_ep=EgoyMDI1MTIwOS4wIKXMDSoASAFQAw%3D%3D\" target=\"_blank\" rel=\"nofollow noopener\">Division Street Bridge<\/a>: &#8220;The Division St. bridges (over the river and over the Canal) will have construction however will not be closed in the coming year, since we will be constructing temporary bridges to maintain the traffic flow during construction.&#8221; &#8211; CDOT Spokesperson<\/li>\n<p><br class=\" \"\/><\/p>\n<li class=\"mmrhV WeAzC lZur foTEL SpgmX cnYss qArv hxIMs isuUo hCkek nYZyJ xXFZR luHJ DuCgd Veett \" data-testid=\"prism-list-item\"><a class=\"zZygg UbGlr iFzkS qdXbA WCDhQ DbOXS tqUtK GpWVU iJYzE \" data-testid=\"prism-linkbase\" href=\"https:\/\/www.google.com\/maps\/place\/302+N+Franklin+St,+Chicago,+IL+60606\/@41.8867009,-87.637975,809m\/data=!3m2!1e3!4b1!4m5!3m4!1s0x880e2cb772414891:0x2522336b7230fecc!8m2!3d41.8866969!4d-87.6354001?entry=ttu&amp;g_ep=EgoyMDI1MTAyMi4wIKXMDSoASAFQAw%3D%3D\" target=\"_blank\" rel=\"nofollow noopener\">Franklin\/Orleans Street Bridge<\/a>: &#8220;There is no anticipated closure on this bridge.&#8221; &#8211; CDOT Spokesperson<\/li>\n<p><br class=\" \"\/><\/p>\n<li class=\"mmrhV WeAzC lZur foTEL SpgmX cnYss qArv hxIMs isuUo hCkek nYZyJ xXFZR luHJ DuCgd Veett \" data-testid=\"prism-list-item\"><a class=\"zZygg UbGlr iFzkS qdXbA WCDhQ DbOXS tqUtK GpWVU iJYzE \" data-testid=\"prism-linkbase\" href=\"https:\/\/www.google.com\/maps\/search\/41.891419,+-87.641172?entry=tts&amp;g_ep=EgoyMDI1MTAyNi4wIPu8ASoASAFQAw%3D%3D&amp;skid=3bbcdeb5-ed15-4bbf-a78a-000e93bacecb\" target=\"_blank\" rel=\"nofollow noopener\">Grand Ave Bridge<\/a>: &#8220;This bridge is programmed to have major rehabilitation in the coming years. This capital project will not begin until after Chicago and Halsted have been completed and opened to traffic.&#8221; &#8211; CDOT Spokesperson<\/li>\n<p><br class=\" \"\/><\/p>\n<li class=\"mmrhV WeAzC lZur foTEL SpgmX cnYss qArv hxIMs isuUo hCkek nYZyJ xXFZR luHJ DuCgd Veett \" data-testid=\"prism-list-item\"><a class=\"zZygg UbGlr iFzkS qdXbA WCDhQ DbOXS tqUtK GpWVU iJYzE \" data-testid=\"prism-linkbase\" href=\"https:\/\/www.google.com\/maps\/place\/423+W+Kinzie+St,+Chicago,+IL+60654\/@41.8889467,-87.6385352,809m\/data=!3m2!1e3!4b1!4m5!3m4!1s0x880e2cb6206395e7:0xbb4712619b020913!8m2!3d41.8889467!4d-87.6385352?entry=ttu&amp;g_ep=EgoyMDI1MTAyMi4wIKXMDSoASAFQAw%3D%3D\" target=\"_blank\" rel=\"nofollow noopener\">Kinzie Street Bridge<\/a>: &#8220;Sidewalk repairs are anticipated within the next two years. At that time, other repairs will take place. The exact schedule is not yet determined but other bridge work in the area will be considered before impacting traffic.&#8221; &#8211; CDOT Spokesperson<\/li>\n<p><br class=\" \"\/><\/p>\n<li class=\"mmrhV WeAzC lZur foTEL SpgmX cnYss qArv hxIMs isuUo hCkek nYZyJ xXFZR luHJ DuCgd Veett \" data-testid=\"prism-list-item\"><a class=\"zZygg UbGlr iFzkS qdXbA WCDhQ DbOXS tqUtK GpWVU iJYzE \" data-testid=\"prism-linkbase\" href=\"https:\/\/www.google.com\/maps\/search\/41.888516,+-87.614144?entry=tts&amp;g_ep=EgoyMDI1MTAyNy4wIPu8ASoASAFQAw%3D%3D&amp;skid=efa9e9e0-5e49-4d79-85c8-6f39cb4061fc\" target=\"_blank\" rel=\"nofollow noopener\">DuSable Lake Shore Drive Bridge<\/a>: &#8220;This project is expected to require improvements of an undetermined extent within the next several years.&#8221; &#8211; CDOT Spokesperson<\/li>\n<p><br class=\" \"\/><\/p>\n<li class=\"mmrhV WeAzC lZur foTEL SpgmX cnYss qArv hxIMs isuUo hCkek nYZyJ xXFZR luHJ DuCgd Veett \" data-testid=\"prism-list-item\"><a class=\"zZygg UbGlr iFzkS qdXbA WCDhQ DbOXS tqUtK GpWVU iJYzE \" data-testid=\"prism-linkbase\" href=\"https:\/\/www.google.com\/maps\/place\/307+N+La+Salle+Dr,+Chicago,+IL+60654\/@41.8879081,-87.63482,809m\/data=!3m2!1e3!4b1!4m5!3m4!1s0x880e2cb1209fc0df:0x12ec721ca143ffc3!8m2!3d41.8879041!4d-87.6322451?entry=ttu&amp;g_ep=EgoyMDI1MTAyMi4wIKXMDSoASAFQAw%3D%3D\" target=\"_blank\" rel=\"nofollow noopener\">N LaSalle St<\/a>: &#8220;This bridge is programmed to have major rehabilitation as soon as 2026.&#8221; &#8211; CDOT Spokesperson<\/li>\n<p><br class=\" \"\/><\/p>\n<li class=\"mmrhV WeAzC lZur foTEL SpgmX cnYss qArv hxIMs isuUo hCkek nYZyJ xXFZR luHJ DuCgd Veett \" data-testid=\"prism-list-item\"><a class=\"zZygg UbGlr iFzkS qdXbA WCDhQ DbOXS tqUtK GpWVU iJYzE \" data-testid=\"prism-linkbase\" href=\"https:\/\/www.google.com\/maps\/place\/365+N+Michigan+Ave,+Chicago,+IL+60601\/@41.8884428,-87.6291682,809m\/data=!3m2!1e3!4b1!4m6!3m5!1s0x880e2caec510e291:0xeed66070f009d390!8m2!3d41.8884389!4d-87.6242973!16s%2Fg%2F11c1ybg9ym?entry=ttu&amp;g_ep=EgoyMDI1MTAyMi4wIKXMDSoASAFQAw%3D%3D\" target=\"_blank\" rel=\"nofollow noopener\">Michigan Ave Bridge<\/a>: &#8220;This bridge is in the planning stages of design for a major capital rehabilitation. Construction is still 3-5 years from now based on design completion and funding programming.&#8221; &#8211; CDOT Spokesperson<\/li>\n<p><br class=\" \"\/><\/p>\n<li class=\"mmrhV WeAzC lZur foTEL SpgmX cnYss qArv hxIMs isuUo hCkek nYZyJ xXFZR luHJ DuCgd Veett \" data-testid=\"prism-list-item\"><a class=\"zZygg UbGlr iFzkS qdXbA WCDhQ DbOXS tqUtK GpWVU iJYzE \" data-testid=\"prism-linkbase\" href=\"https:\/\/www.google.com\/maps\/place\/230+W+Roosevelt+Rd,+Chicago,+IL+60607\/@41.8672765,-87.6345416,1619m\/data=!3m1!1e3!4m5!3m4!1s0x880e2c9227e88003:0x25f4961adbd5ffd9!8m2!3d41.867386!4d-87.6333085?entry=ttu&amp;g_ep=EgoyMDI1MTAyMi4wIKXMDSoASAFQAw%3D%3D\" target=\"_blank\" rel=\"nofollow noopener\">Roosevelt Road Bridge<\/a>: &#8220;This bridge is in the planning stages of design for a major capital rehabilitation. Construction is still 3-5 years from now based on design completion and funding programming.&#8221; &#8211; CDOT Spokesperson<\/li>\n<p><br class=\" \"\/><\/p>\n<li class=\"mmrhV WeAzC lZur foTEL SpgmX cnYss qArv hxIMs isuUo hCkek nYZyJ xXFZR luHJ DuCgd Veett \" data-testid=\"prism-list-item\"><a class=\"zZygg UbGlr iFzkS qdXbA WCDhQ DbOXS tqUtK GpWVU iJYzE \" data-testid=\"prism-linkbase\" href=\"https:\/\/www.google.com\/maps\/search\/41.964806,+-87.697172?entry=tts&amp;g_ep=EgoyMDI1MTAyNi4wIPu8ASoASAFQAw%3D%3D&amp;skid=5c52a929-700b-45f7-b7bf-301da6bfb498\" target=\"_blank\" rel=\"nofollow noopener\">Wilson Ave Bridge<\/a>: &#8220;This is over the North Branch of the Chicago River. This project is expected to require improvements of an undetermined extent, following those already scheduled, within the next several years.&#8221; &#8211; CDOT Spokesperson<\/li>\n<p><br class=\" \"\/><\/p>\n<li class=\"mmrhV WeAzC lZur foTEL SpgmX cnYss qArv hxIMs isuUo hCkek nYZyJ xXFZR luHJ DuCgd Veett \" data-testid=\"prism-list-item\"><a class=\"zZygg UbGlr iFzkS qdXbA WCDhQ DbOXS tqUtK GpWVU iJYzE \" data-testid=\"prism-linkbase\" href=\"https:\/\/www.google.com\/maps\/search\/41.884484,+-87.637958?entry=tts&amp;g_ep=EgoyMDI1MTAyNi4wIPu8ASoASAFQAw%3D%3D&amp;skid=519cc105-cf16-4bd3-a7af-90191c0be2c6\" target=\"_blank\" rel=\"nofollow noopener\">Randolph Street<\/a>: &#8220;There is no anticipated closure for this bridge.&#8221; &#8211; CDOT Spokesperson<\/li>\n<\/ul>\n<p>Copyright \u00a9 2025 WLS-TV. All Rights Reserved.<\/p>\n","protected":false},"excerpt":{"rendered":"CHICAGO (WLS) &#8212; As holiday commuters continue to snarl up traffic around the downtown Loop, the ABC7 I-Team&hellip;\n","protected":false},"author":3,"featured_media":465612,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5124],"tags":[211856,960,211852,211851,211853,211854,26073,211849,211850,8755,5386,1818,211855],"class_list":{"0":"post-465611","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-chicago","8":"tag-211856","9":"tag-chicago","10":"tag-chicago-bridge","11":"tag-chicago-bridge-closures","12":"tag-chicago-bridges","13":"tag-chicago-construction","14":"tag-chicago-river","15":"tag-chicago-river-bridge","16":"tag-chicago-river-bridges","17":"tag-chicago-traffic","18":"tag-il","19":"tag-illinois","20":"tag-new-construction-chicago"},"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@us\/115766413381048659","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/posts\/465611","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/comments?post=465611"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/posts\/465611\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/media\/465612"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/media?parent=465611"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/categories?post=465611"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/tags?post=465611"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}