{"id":506108,"date":"2026-01-10T12:22:09","date_gmt":"2026-01-10T12:22:09","guid":{"rendered":"https:\/\/www.europesays.com\/us\/506108\/"},"modified":"2026-01-10T12:22:09","modified_gmt":"2026-01-10T12:22:09","slug":"southbound-la-cienega-boulevard-to-see-lane-reductions-for-bus-pad-construction","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/us\/506108\/","title":{"rendered":"Southbound La Cienega Boulevard to See Lane Reductions for Bus Pad Construction"},"content":{"rendered":"<p><strong>Traffic Will Be Limited Between Clifton Way and Gregory Way Beginning January 10<\/strong><\/p>\n<p>Traffic restrictions are scheduled to begin this weekend along southbound La Cienega Boulevard as crews start construction of a new bus pad and make curb and gutter improvements, transportation officials said.<\/p>\n<p>Construction is set to begin at <strong>4:00 a.m. Saturday, January 10<\/strong>, and is expected to continue for approximately three weeks. During that time, <strong>southbound La Cienega Boulevard will be reduced to two lanes<\/strong> between <strong>Clifton Way and Gregory Way<\/strong>, with intermittent reductions to a single lane. The work is scheduled to continue through <strong>January 24, 2026<\/strong>, though officials said the timeline could be extended by up to one additional week if delays occur.<\/p>\n<p>Southbound La Cienega Boulevard will be intermittently reduced to <strong>one lane<\/strong> between Clifton Way and Gregory Way during the following hours:<\/p>\n<ul class=\"wp-block-list\">\n<li><strong>9:00 a.m. to 4:00 p.m., Monday through Friday<\/strong><strong><br \/><\/strong><\/li>\n<li><strong>6:00 a.m. to 6:00 p.m., Saturday and Sunday<\/strong><\/li>\n<\/ul>\n<p>In addition, southbound traffic will be reduced to <strong>two lanes on a continuous basis<\/strong> for approximately <strong>two to three weeks<\/strong>, pending final approval from the City of Beverly Hills.<\/p>\n<p>The construction area is located near the intersection of <strong>Wilshire Boulevard and La Cienega Boulevard<\/strong>.<\/p>\n<p>Officials said local access will be maintained on <strong>westbound Wilshire Boulevard between San Vicente Boulevard and La Cienega Boulevard<\/strong> throughout the construction period. All work has received the necessary permits and approvals.<\/p>\n<p>Motorists are advised to allow extra travel time and consider alternate routes during peak hours. Construction schedules remain subject to change based on operational needs.<\/p>\n<p>A <strong>24-hour project hotline<\/strong> is available at <strong>213-922-6934<\/strong> for questions or concerns.<\/p>\n<p>Metro officials noted that the agency\u2019s <strong>Business Interruption Fund<\/strong> offers financial assistance to qualifying small, independently owned businesses affected by construction activity. More information is available at <strong>metro.net\/bif<\/strong>. Applications are administered through the <strong>Pacific Coast Regional Small Business<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"Traffic Will Be Limited Between Clifton Way and Gregory Way Beginning January 10 Traffic restrictions are scheduled to&hellip;\n","protected":false},"author":3,"featured_media":506109,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5123],"tags":[1582,276,2961,224,5337],"class_list":{"0":"post-506108","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-los-angeles","8":"tag-ca","9":"tag-california","10":"tag-la","11":"tag-los-angeles","12":"tag-losangeles"},"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@us\/115870783746323829","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/posts\/506108","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/comments?post=506108"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/posts\/506108\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/media\/506109"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/media?parent=506108"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/categories?post=506108"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/tags?post=506108"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}