{"id":807837,"date":"2026-05-19T16:29:12","date_gmt":"2026-05-19T16:29:12","guid":{"rendered":"https:\/\/www.europesays.com\/us\/807837\/"},"modified":"2026-05-19T16:29:12","modified_gmt":"2026-05-19T16:29:12","slug":"india-curtailed-300-gwh-of-clean-energy-in-q1-as-grid-lags-solar-build","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/us\/807837\/","title":{"rendered":"India Curtailed 300 GWh of Clean Energy in Q1 as Grid Lags Solar Build"},"content":{"rendered":"<p class=\"speakable\">India&#8217;s electricity grid is expanding at a slower pace than the boom in renewable energy installations, leading to increased share of clean energy curtailments and threatening to slow the solar and wind boom in the world&#8217;s most populous country.<\/p>\n<p>Grid and transmission constraints accounted for nearly two-thirds of all renewable energy curtailment at 300 gigawatt-hours (GWh) in the first quarter of the year, clean energy think tank Ember said in a <a href=\"https:\/\/ember-energy.org\/latest-insights\/transmission-gaps-are-beginning-to-constrain-indias-rapid-renewables-integration\/\" rel=\"nofollow noopener\" target=\"_blank\">report<\/a> on Tuesday.<\/p>\n<p>\u201cThis growing mismatch between fast-moving solar projects and slower-moving transmission infrastructure is now the most critical operational risk to the country\u2019s 2030 target of 500 gigawatts (GW) of non-fossil electricity,\u201d Ember\u2019s analysts wrote.<\/p>\n<p>While India\u2019s solar and wind power installations have been outpacing government targets in recent years, India has delivered only about 80% of its annual transmission targets in the past five years, according to Ember\u2019s analysis.<\/p>\n<p>Currently, one in four Inter-State Transmission System schemes nationwide faces a delay of a year or more, due to right-of-way disputes, fragmented land ownership, forest and biodiversity clearances, and a thin global supplier base for high-voltage direct current (HVDC) components, Ember notes.<\/p>\n<p>India expects to nearly <a href=\"https:\/\/oilprice.com\/Latest-Energy-News\/World-News\/India-Unveils-Ambitious-Plan-to-Quadruple-Solar-Power-by-2035.html\" rel=\"nofollow noopener\" target=\"_blank\">quadruple its solar power<\/a> capacity and triple wind power-generating assets within ten years, according to the new Generation Adequacy Plan published by the country\u2019s Central Electricity Authority earlier this year.<\/p>\n<p>In 2025, India <a href=\"https:\/\/www.pib.gov.in\/newsite\/pmreleases.aspx?mincode=28\" rel=\"nofollow noopener\" target=\"_blank\">boasted<\/a> achieving five years ahead of schedule its target to have 50% of its installed electricity capacity coming from non-fossil fuel sources.<\/p>\n<p>Despite booming renewable capacity additions, India continues to rely on coal to meet most of its power demand as authorities also look to avoid blackouts in cases of severe heat waves.<\/p>\n<p>Coal-fired power generation and capacity installations in India continue to rise, and coal remains a key pillar of India\u2019s electricity mix, with about 60% share of total power output.<\/p>\n<p>This jump in installed renewable capacity does not mean renewable power generation will soon replace coal in India, especially if <a href=\"https:\/\/oilprice.com\/Latest-Energy-News\/World-News\/India-Reduces-Solar-Output-to-Keep-Power-Grid-Stable.html\" rel=\"nofollow noopener\" target=\"_blank\">grid constraints<\/a> and battery and transmission delays persist.<\/p>\n<p>By Charles Kennedy for <a href=\"http:\/\/oilprice.com\" rel=\"nofollow noopener\" target=\"_blank\">Oilprice.com<\/a><\/p>\n<p><strong>More Top Reads From Oilprice.com<\/strong><a href=\"https:\/\/oilprice.com\/Latest-Energy-News\/World-News\/The-Iran-War-Has-Upended-Global-LNG-Markets.html\" data-embargo=\"1774512000\" rel=\"nofollow noopener\" target=\"_blank\"><\/p>\n","protected":false},"excerpt":{"rendered":"India&#8217;s electricity grid is expanding at a slower pace than the boom in renewable energy installations, leading to&hellip;\n","protected":false},"author":3,"featured_media":807838,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[23],"tags":[328557,311116,328553,746,328554,328556,328550,328549,328555,159,328551,67,132,68,328552],"class_list":["post-807837","post","type-post","status-publish","format-standard","has-post-thumbnail","category-environment","tag-clean-energy-infrastructure","tag-ember-report","tag-energy-transmission-delays","tag-environment","tag-india-500gw-target","tag-india-coal-power","tag-india-grid-constraints","tag-india-renewable-energy","tag-ists-transmission","tag-science","tag-solar-power-curtailment","tag-united-states","tag-unitedstates","tag-us","tag-wind-energy-india"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@us\/116602192864439495","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/posts\/807837","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/comments?post=807837"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/posts\/807837\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/media\/807838"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/media?parent=807837"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/categories?post=807837"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/tags?post=807837"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}