{"id":866279,"date":"2026-06-14T07:56:14","date_gmt":"2026-06-14T07:56:14","guid":{"rendered":"https:\/\/www.europesays.com\/us\/866279\/"},"modified":"2026-06-14T07:56:14","modified_gmt":"2026-06-14T07:56:14","slug":"the-end-nears-for-loop-101-north-scottsdale-work-city-news","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/us\/866279\/","title":{"rendered":"The end nears for Loop 101 North Scottsdale work | City News"},"content":{"rendered":"<p>                        <img loading=\"lazy\" decoding=\"async\" src=\"data:image\/png;base64,iVBORw0KGgoAAAANSUhEUgAAAAQAAAADCAQAAAAe\/WZNAAAAEElEQVR42mM8U88ABowYDABAxQPltt5zqAAAAABJRU5ErkJggg==\" alt=\"739796 L101 Princess Dr-no MP-updateB\" class=\"img-responsive lazyload full default\" width=\"1084\" height=\"1911\" data- data-\/><\/p>\n<p>A massive freeway project is nearing completion.\u00a0<\/p>\n<p>                                    (ADOT)<\/p>\n<p>The key phrase: \u201cweather permitting.\u201d<\/p>\n<p>With that understood, commuters and others who travel a key stretch of the Loop 101 in Scottsdale can breathe a sigh of relief.<\/p>\n<p>The end of a massive, two-year, backup-causing construction project is near \u2026<\/p>\n<p>\u201cAt this time we expect completion by the end of July, but weather and other factors can affect a project timeline,\u201d an Arizona Department of Transportation spokesman said.<\/p>\n<p>The anticipated two-year project that began in January 2024 is stretching several months beyond the original estimate.<\/p>\n<p>The major part of construction has been finished for months, as the widening project between Princess and Shea ended over a month ago.<\/p>\n<p>The widening was followed by paving, which started in late April and is scheduled to end by late summer.<\/p>\n<p>There is still work to be done, however.<\/p>\n<p>ADOT advises drivers to plan for the following restrictions as work continues on the Loop 101 (Pima Freeway), Princess Drive\/Pima Road to Shea Boulevard pavement project in north Scottsdale:<\/p>\n<p>North- and southbound Loop 101 will be narrowed to two lanes in each direction between Shea Boulevard and Princess Drive\/Pima Road from 10 p.m. to 5 a.m. Wednesday night, June 10, and Thursday night June 11, and again from 10 p.m. Friday, June 12, to 5 a.m. Monday, June 15.<\/p>\n<p>During this time, expect closures of:<\/p>\n<p>\u2022 Shea Boulevard on- and off-ramps;<\/p>\n<p>\u2022 Cactus Road on- and off-ramps;<\/p>\n<p>\u2022 Raintree Drive on- and off-ramps;<\/p>\n<p>\u2022 Frank Lloyd Wright Boulevard on- and off-ramps;<\/p>\n<p>\u2022 Pima Road on- and off-ramps.<\/p>\n<p>Ramp detours: Drivers may consider using the next on- or off-ramp along the freeway. Consecutive on- and off-ramps will not be closed simultaneously.<\/p>\n<p>Follow the signed detour routes.<\/p>\n<p>A full description of the work thus far explains, \u201cThe Princess-to-Shea pavement improvement project, which removed the top layer of surface asphalt and is diamond-grinding the concrete pavement to provide a smoother, more durable surface, began in late April and is scheduled to be completed this summer.\u201d<\/p>\n<p>According to ADOT, \u201cThe Arizona Department of Transportation, in partnership with the City of Scottsdale, widened Loop 101 (Pima Freeway) between Princess Drive\/Pima Road and Shea Boulevard by one general-purpose lane in each direction and modified existing interchanges to improve traffic flow on Loop 101 and the cross streets.\u201d<\/p>\n<p>The new lanes give that stretch of Loop 101 four regular lanes and the existing HOV lanes in each direction.<\/p>\n<p>The project is the latest in a series of projects to widen approximately 35 miles of Loop 101 between Interstate 17 in north Phoenix and Loop 202 Santan Freeway in Chandler.<\/p>\n","protected":false},"excerpt":{"rendered":"A massive freeway project is nearing completion.\u00a0 (ADOT) The key phrase: \u201cweather permitting.\u201d With that understood, commuters and&hellip;\n","protected":false},"author":3,"featured_media":866280,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[5131],"tags":[5229,5643,32560,1587,60768,1589,50878,353010,7600,353011,67,586,132,5230,68,2969],"class_list":["post-866279","post","type-post","status-publish","format-standard","has-post-thumbnail","category-phoenix","tag-america","tag-arizona","tag-arizona-department-of-transportation","tag-az","tag-loop-101","tag-phoenix","tag-pima-freeway","tag-princess-drive","tag-scottsdale","tag-shea-boulevard","tag-united-states","tag-united-states-of-america","tag-unitedstates","tag-unitedstatesofamerica","tag-us","tag-usa"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@us\/116747395828054877","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/posts\/866279","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/comments?post=866279"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/posts\/866279\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/media\/866280"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/media?parent=866279"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/categories?post=866279"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/us\/wp-json\/wp\/v2\/tags?post=866279"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}